Energy Performance Certificate

Flat 24 Pinner House, Church Lane, HA5 3AA

EPC Report

Energy rating

Current: 68 D | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 68 D Current: 68 D 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 67 | Potential: 77
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 67 Current: 67 77 Potential: 77
Field Value
LMK KEY 9898-8080-7211-3161-6914
ADDRESS1 Flat 24 Pinner House
ADDRESS2 Church Lane
ADDRESS3
POSTCODE HA5 3AA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 68
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2019-09-11
LOCAL AUTHORITY E09000015
CONSTITUENCY E14001454
COUNTY
LODGEMENT DATE 2019-09-11
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 67
ENVIRONMENT IMPACT POTENTIAL 77
ENERGY CONSUMPTION CURRENT 358
ENERGY CONSUMPTION POTENTIAL 255
CO2 EMISSIONS CURRENT 1.7
CO2 EMISS CURR PER FLOOR AREA 61
CO2 EMISSIONS POTENTIAL 1.2
LIGHTING COST CURRENT 28
LIGHTING COST POTENTIAL 28
HEATING COST CURRENT 292
HEATING COST POTENTIAL 80
HOT WATER COST CURRENT 153
HOT WATER COST POTENTIAL 132
TOTAL FLOOR AREA 27
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Room thermostat only
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 1
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Timber frame, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Flat, limited insulation (assumed)
ROOF ENERGY EFF Poor
ROOF ENV EFF Poor
MAINHEAT DESCRIPTION Electric ceiling heating
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Room thermostat only
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.3
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Flat 24 Pinner House, Church Lane
LOCAL AUTHORITY LABEL Harrow
CONSTITUENCY LABEL Ruislip, Northwood and Pinner
POSTTOWN PINNER
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2019-09-11 16:53:39
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 4
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 100023035793
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000007
Address display
Nation ew