Energy Performance Certificate

6, Browning Road, Barnby Dun, DN3 1AT

EPC Report

Energy rating

Current: 49 E | Potential: 86 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 49 E Current: 49 E 86 B Potential: 86 B

Environmental impact (CO₂)

Current: 42 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 42 Current: 42 85 Potential: 85
Field Value
LMK KEY 9848-6927-7230-4776-8934
ADDRESS1 6, Browning Road
ADDRESS2 Barnby Dun
ADDRESS3
POSTCODE DN3 1AT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 49
POTENTIAL ENERGY EFFICIENCY 86
PROPERTY TYPE Bungalow
BUILT FORM Semi-Detached
INSPECTION DATE 2016-10-14
LOCAL AUTHORITY E08000017
CONSTITUENCY E14001200
COUNTY
LODGEMENT DATE 2016-10-15
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 42
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 416
ENERGY CONSUMPTION POTENTIAL 98
CO2 EMISSIONS CURRENT 5.1
CO2 EMISS CURR PER FLOOR AREA 73
CO2 EMISSIONS POTENTIAL 1.2
LIGHTING COST CURRENT 95
LIGHTING COST POTENTIAL 48
HEATING COST CURRENT 784
HEATING COST POTENTIAL 418
HOT WATER COST CURRENT 258
HOT WATER COST POTENTIAL 72
TOTAL FLOOR AREA 69
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA More Than Typical
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 0
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION No low energy lighting
LIGHTING ENERGY EFF Very Poor
LIGHTING ENV EFF Very Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.44
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 6, Browning Road, Barnby Dun
LOCAL AUTHORITY LABEL Doncaster
CONSTITUENCY LABEL Doncaster North
POSTTOWN DONCASTER
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2016-10-15 14:04:47
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 0
UPRN 100050704035
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000003
Address display
Nation ew