Energy Performance Certificate

20, Chapel Lane, St. Mabyn, PL30 3BD

EPC Report

Energy rating

Current: 36 F | Potential: 65 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 36 F Current: 36 F 65 D Potential: 65 D

Environmental impact (CO₂)

Current: 33 | Potential: 55
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 33 Current: 33 55 Potential: 55
Field Value
LMK KEY 9728-2068-6236-9592-1940
ADDRESS1 20, Chapel Lane
ADDRESS2 St. Mabyn
ADDRESS3
POSTCODE PL30 3BD
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 36
POTENTIAL ENERGY EFFICIENCY 65
PROPERTY TYPE Bungalow
BUILT FORM End-Terrace
INSPECTION DATE 2012-06-12
LOCAL AUTHORITY E06000052
CONSTITUENCY E14001385
COUNTY
LODGEMENT DATE 2012-06-12
TRANSACTION TYPE rental (social)
ENVIRONMENT IMPACT CURRENT 33
ENVIRONMENT IMPACT POTENTIAL 55
ENERGY CONSUMPTION CURRENT 449
ENERGY CONSUMPTION POTENTIAL 229
CO2 EMISSIONS CURRENT 5.3
CO2 EMISS CURR PER FLOOR AREA 86
CO2 EMISSIONS POTENTIAL 2.8
LIGHTING COST CURRENT 64
LIGHTING COST POTENTIAL 35
HEATING COST CURRENT 783
HEATING COST POTENTIAL 621
HOT WATER COST CURRENT 248
HOT WATER COST POTENTIAL 128
TOTAL FLOOR AREA 62
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS No thermostatic control of room temperature
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 20
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Very Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION No thermostatic control of room temperature
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 20% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL dual fuel - mineral + wood
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.31
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 20, Chapel Lane, St. Mabyn
LOCAL AUTHORITY LABEL Cornwall
CONSTITUENCY LABEL North Cornwall
POSTTOWN BODMIN
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2012-06-12 11:53:08
TENURE
FIXED LIGHTING OUTLETS COUNT 5
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 100040081107
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2012.csv
COUNTRY England
REGION E12000009
Address display
Nation ew