Energy Performance Certificate

6 Sutton Park, Bishop Sutton, BS39 5UQ

EPC Report

Energy rating

Current: 63 D | Potential: 75 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 63 D Current: 63 D 75 C Potential: 75 C

Environmental impact (CO₂)

Current: 55 | Potential: 67
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 55 Current: 55 67 Potential: 67
Field Value
LMK KEY 9575-3051-5206-7015-7200
ADDRESS1 6 Sutton Park
ADDRESS2 Bishop Sutton
ADDRESS3
POSTCODE BS39 5UQ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 63
POTENTIAL ENERGY EFFICIENCY 75
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2025-06-13
LOCAL AUTHORITY E06000022
CONSTITUENCY E14001394
COUNTY
LODGEMENT DATE 2025-06-14
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 55
ENVIRONMENT IMPACT POTENTIAL 67
ENERGY CONSUMPTION CURRENT 223
ENERGY CONSUMPTION POTENTIAL 152
CO2 EMISSIONS CURRENT 6.3
CO2 EMISS CURR PER FLOOR AREA 39
CO2 EMISSIONS POTENTIAL 4.3
LIGHTING COST CURRENT 240
LIGHTING COST POTENTIAL 136
HEATING COST CURRENT 1470
HEATING COST POTENTIAL 1347
HOT WATER COST CURRENT 194
HOT WATER COST POTENTIAL 122
TOTAL FLOOR AREA 160
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 8
NUMBER HEATED ROOMS 8
LOW ENERGY LIGHTING 24
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 24% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.31
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 6 Sutton Park, Bishop Sutton
LOCAL AUTHORITY LABEL Bath and North East Somerset
CONSTITUENCY LABEL North East Somerset and Hanham
POSTTOWN BRISTOL
CONSTRUCTION AGE BAND England and Wales: 1991-1995
LODGEMENT DATETIME 2025-06-14 07:44:45
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 25
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 100120054198
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000009
Address display
Nation ew