Energy Performance Certificate

35, The Turn, Hevingham, NR10 5QP

EPC Report

Energy rating

Current: 45 E | Potential: 87 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 45 E Current: 45 E 87 B Potential: 87 B

Environmental impact (CO₂)

Current: 32 | Potential: 76
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 32 Current: 32 76 Potential: 76
Field Value
LMK KEY 9514-2846-7925-9907-3971
ADDRESS1 35, The Turn
ADDRESS2 Hevingham
ADDRESS3
POSTCODE NR10 5QP
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 45
POTENTIAL ENERGY EFFICIENCY 87
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2013-12-06
LOCAL AUTHORITY E07000144
CONSTITUENCY E14001136
COUNTY
LODGEMENT DATE 2013-12-16
TRANSACTION TYPE Assessment for Green Deal
ENVIRONMENT IMPACT CURRENT 32
ENVIRONMENT IMPACT POTENTIAL 76
ENERGY CONSUMPTION CURRENT 292
ENERGY CONSUMPTION POTENTIAL 69
CO2 EMISSIONS CURRENT 11
CO2 EMISS CURR PER FLOOR AREA 76
CO2 EMISSIONS POTENTIAL 3.0
LIGHTING COST CURRENT 107
LIGHTING COST POTENTIAL 68
HEATING COST CURRENT 2204
HEATING COST POTENTIAL 918
HOT WATER COST CURRENT 303
HOT WATER COST POTENTIAL 112
TOTAL FLOOR AREA 140
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 43
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 43% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 35, The Turn, Hevingham
LOCAL AUTHORITY LABEL Broadland
CONSTITUENCY LABEL Broadland and Fakenham
POSTTOWN NORWICH
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2013-12-16 16:13:18
TENURE Owner-occupied
FIXED LIGHTING OUTLETS COUNT 14
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 100091543359
UPRN SOURCE Address Matched
REPORT TYPE 2
Source file certificates-2013.csv
COUNTRY England
REGION E12000006
Address display
Nation ew