Energy Performance Certificate

9, Bowmont Drive, HP21 9UH

EPC Report

Energy rating

Current: 59 D | Potential: 88 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 D Current: 59 D 88 B Potential: 88 B

Environmental impact (CO₂)

Current: 38 | Potential: 70
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 38 Current: 38 70 Potential: 70
Field Value
LMK KEY 9488-9047-7296-1007-0980
ADDRESS1 9, Bowmont Drive
ADDRESS2
ADDRESS3
POSTCODE HP21 9UH
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 59
POTENTIAL ENERGY EFFICIENCY 88
PROPERTY TYPE Bungalow
BUILT FORM End-Terrace
INSPECTION DATE 2013-06-18
LOCAL AUTHORITY E06000060
CONSTITUENCY E14001071
COUNTY
LODGEMENT DATE 2013-06-18
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 38
ENVIRONMENT IMPACT POTENTIAL 70
ENERGY CONSUMPTION CURRENT 490
ENERGY CONSUMPTION POTENTIAL 209
CO2 EMISSIONS CURRENT
CO2 EMISS CURR PER FLOOR AREA
CO2 EMISSIONS POTENTIAL
LIGHTING COST CURRENT 72
LIGHTING COST POTENTIAL 36
HEATING COST CURRENT 497
HEATING COST POTENTIAL 323
HOT WATER COST CURRENT 107
HOT WATER COST POTENTIAL 69
TOTAL FLOOR AREA 55
ENERGY TARIFF dual
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 0
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Very Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Timber frame, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION No low energy lighting
LIGHTING ENERGY EFF Very Poor
LIGHTING ENV EFF Very Poor
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.42
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 9, Bowmont Drive
LOCAL AUTHORITY LABEL Buckinghamshire
CONSTITUENCY LABEL Aylesbury
POSTTOWN AYLESBURY
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2013-06-18 21:53:49
TENURE Owner-occupied
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 0
UPRN 766290544
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2013.csv
COUNTRY England
REGION E12000008
Address display
Nation ew