Energy Performance Certificate

10, Cooper Close, Caister-on-Sea, NR30 5EN

EPC Report

Energy rating

Current: 74 C | Potential: 83 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 74 C Current: 74 C 83 B Potential: 83 B

Environmental impact (CO₂)

Current: 70 | Potential: 78
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 70 Current: 70 78 Potential: 78
Field Value
LMK KEY 9458-1992-6260-4041-1940
ADDRESS1 10, Cooper Close
ADDRESS2 Caister-on-Sea
ADDRESS3
POSTCODE NR30 5EN
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 74
POTENTIAL ENERGY EFFICIENCY 83
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2019-10-15
LOCAL AUTHORITY E07000145
CONSTITUENCY E14001256
COUNTY
LODGEMENT DATE 2019-10-15
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 70
ENVIRONMENT IMPACT POTENTIAL 78
ENERGY CONSUMPTION CURRENT 161
ENERGY CONSUMPTION POTENTIAL 109
CO2 EMISSIONS CURRENT 4.2
CO2 EMISS CURR PER FLOOR AREA 28
CO2 EMISSIONS POTENTIAL 2.9
LIGHTING COST CURRENT 125
LIGHTING COST POTENTIAL 94
HEATING COST CURRENT 677
HEATING COST POTENTIAL 681
HOT WATER COST CURRENT 114
HOT WATER COST POTENTIAL 77
TOTAL FLOOR AREA 146
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Time and temperature zone control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 67
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, insulated (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and underfloor heating, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Time and temperature zone control
MAINHEATC ENERGY EFF Very Good
MAINHEATC ENV EFF Very Good
LIGHTING DESCRIPTION Low energy lighting in 67% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.35
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 10, Cooper Close, Caister-on-Sea
LOCAL AUTHORITY LABEL Great Yarmouth
CONSTITUENCY LABEL Great Yarmouth
POSTTOWN GREAT YARMOUTH
CONSTRUCTION AGE BAND England and Wales: 2003-2006
LODGEMENT DATETIME 2019-10-15 11:35:06
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 15
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 10012179112
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000006
Address display
Nation ew