Energy Performance Certificate

3, Tealby Street, LN5 8BS

EPC Report

Energy rating

Current: 53 E | Potential: 79 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 53 E Current: 53 E 79 C Potential: 79 C

Environmental impact (CO₂)

Current: 51 | Potential: 79
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 51 Current: 51 79 Potential: 79
Field Value
LMK KEY 9380-2675-8000-2290-7005
ADDRESS1 3, Tealby Street
ADDRESS2
ADDRESS3
POSTCODE LN5 8BS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 53
POTENTIAL ENERGY EFFICIENCY 79
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2020-10-15
LOCAL AUTHORITY E07000138
CONSTITUENCY E14001336
COUNTY
LODGEMENT DATE 2020-10-19
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 51
ENVIRONMENT IMPACT POTENTIAL 79
ENERGY CONSUMPTION CURRENT 392
ENERGY CONSUMPTION POTENTIAL 158
CO2 EMISSIONS CURRENT 3.7
CO2 EMISS CURR PER FLOOR AREA 69
CO2 EMISSIONS POTENTIAL 1.5
LIGHTING COST CURRENT 51
LIGHTING COST POTENTIAL 51
HEATING COST CURRENT 673
HEATING COST POTENTIAL 569
HOT WATER COST CURRENT 181
HOT WATER COST POTENTIAL 64
TOTAL FLOOR AREA 53
ENERGY TARIFF dual
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, insulated (assumed)
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 5
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 3, Tealby Street
LOCAL AUTHORITY LABEL Lincoln
CONSTITUENCY LABEL Lincoln
POSTTOWN LINCOLN
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2020-10-19 13:27:20
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 4
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 235017418
UPRN SOURCE Address Matched
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY England
REGION E12000004
Address display
Nation ew