Energy Performance Certificate

Flat 10 Parkside House, Bell Farm Avenue, RM10 7AU

EPC Report

Energy rating

Current: 70 C | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 70 C Current: 70 C 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 51 | Potential: 72
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 51 Current: 51 72 Potential: 72
Field Value
LMK KEY 9378-4044-7294-3755-3950
ADDRESS1 Flat 10 Parkside House
ADDRESS2 Bell Farm Avenue
ADDRESS3
POSTCODE RM10 7AU
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 70
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2015-04-13
LOCAL AUTHORITY E09000002
CONSTITUENCY E14001189
COUNTY
LODGEMENT DATE 2015-05-14
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 51
ENVIRONMENT IMPACT POTENTIAL 72
ENERGY CONSUMPTION CURRENT 381
ENERGY CONSUMPTION POTENTIAL 221
CO2 EMISSIONS CURRENT 3.1
CO2 EMISS CURR PER FLOOR AREA 64
CO2 EMISSIONS POTENTIAL 1.8
LIGHTING COST CURRENT 37
LIGHTING COST POTENTIAL 37
HEATING COST CURRENT 325
HEATING COST POTENTIAL 121
HOT WATER COST CURRENT 128
HOT WATER COST POTENTIAL 128
TOTAL FLOOR AREA 48
ENERGY TARIFF dual
MAINS GAS FLAG Y
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Automatic charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Electric storage heaters, Electric storage heaters
MAINHEAT ENERGY EFF Poor
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Automatic charge control
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 8
FLOOR HEIGHT 2.45
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Flat 10 Parkside House, Bell Farm Avenue
LOCAL AUTHORITY LABEL Barking and Dagenham
CONSTITUENCY LABEL Dagenham and Rainham
POSTTOWN DAGENHAM
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2015-05-14 16:21:21
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 8
UPRN 100063025
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000007
Address display
Nation ew