Energy Performance Certificate

1 Bankside, Castle Eden, TS27 4SF

EPC Report

Energy rating

Current: 35 F | Potential: 91 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 35 F Current: 35 F 91 B Potential: 91 B

Environmental impact (CO₂)

Current: 19 | Potential: 56
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 19 Current: 19 56 Potential: 56
Field Value
LMK KEY 9374-1004-5213-3582-3210
ADDRESS1 1 Bankside
ADDRESS2 Castle Eden
ADDRESS3
POSTCODE TS27 4SF
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 35
POTENTIAL ENERGY EFFICIENCY 91
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2022-07-13
LOCAL AUTHORITY E06000047
CONSTITUENCY E14001211
COUNTY
LODGEMENT DATE 2022-07-13
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 19
ENVIRONMENT IMPACT POTENTIAL 56
ENERGY CONSUMPTION CURRENT 779
ENERGY CONSUMPTION POTENTIAL 325
CO2 EMISSIONS CURRENT 11
CO2 EMISS CURR PER FLOOR AREA 132
CO2 EMISSIONS POTENTIAL 4.6
LIGHTING COST CURRENT 76
LIGHTING COST POTENTIAL 76
HEATING COST CURRENT 2101
HEATING COST POTENTIAL 1337
HOT WATER COST CURRENT 229
HOT WATER COST POTENTIAL 128
TOTAL FLOOR AREA 83
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.75
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 1 Bankside, Castle Eden
LOCAL AUTHORITY LABEL County Durham
CONSTITUENCY LABEL Easington
POSTTOWN HARTLEPOOL
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2022-07-13 10:57:58
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 9
UPRN 100110438354
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000001
Address display
Nation ew