Energy Performance Certificate

11 ORCHARD WAY, SHAPWICK, BRIDGWATER, TA7 9NU

EPC Report

Energy rating

Current: 50 E | Potential: 79 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 50 E Current: 50 E 79 C Potential: 79 C

Environmental impact (CO₂)

Current: 44 | Potential: 73
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 44 Current: 44 73 Potential: 73
Field Value
LMK KEY 9370-2836-2000-2400-3081
ADDRESS1 11 ORCHARD WAY
ADDRESS2 SHAPWICK
ADDRESS3 BRIDGWATER
POSTCODE TA7 9NU
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 50
POTENTIAL ENERGY EFFICIENCY 79
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2020-10-06
LOCAL AUTHORITY E06000066
CONSTITUENCY E14001572
COUNTY
LODGEMENT DATE 2020-10-06
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 44
ENVIRONMENT IMPACT POTENTIAL 73
ENERGY CONSUMPTION CURRENT 222
ENERGY CONSUMPTION POTENTIAL 77
CO2 EMISSIONS CURRENT 5.8
CO2 EMISS CURR PER FLOOR AREA 55
CO2 EMISSIONS POTENTIAL 2.4
LIGHTING COST CURRENT 83
LIGHTING COST POTENTIAL 83
HEATING COST CURRENT 766
HEATING COST POTENTIAL 507
HOT WATER COST CURRENT 221
HOT WATER COST POTENTIAL 84
TOTAL FLOOR AREA 105
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 95
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 95% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.38
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 11 ORCHARD WAY, SHAPWICK, BRIDGWATER
LOCAL AUTHORITY LABEL Somerset
CONSTITUENCY LABEL Wells and Mendip Hills
POSTTOWN BRIDGWATER
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2020-10-06 13:00:57
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 19
LOW ENERGY FIXED LIGHT COUNT 18
UPRN 100040893746
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY England
REGION E12000009
Address display
Nation ew