Energy Performance Certificate

3 Council House, Highgate, Leverton, PE22 0AW

EPC Report

Energy rating

Current: 62 D | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 D Current: 62 D 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 66 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 66 Current: 66 85 Potential: 85
Field Value
LMK KEY 9370-2358-9100-2829-7031
ADDRESS1 3 Council House
ADDRESS2 Highgate
ADDRESS3 Leverton
POSTCODE PE22 0AW
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 62
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2021-10-28
LOCAL AUTHORITY E07000136
CONSTITUENCY E14001114
COUNTY
LODGEMENT DATE 2021-10-29
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 66
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 218
ENERGY CONSUMPTION POTENTIAL 90
CO2 EMISSIONS CURRENT 3.4
CO2 EMISS CURR PER FLOOR AREA 37
CO2 EMISSIONS POTENTIAL 1.4
LIGHTING COST CURRENT 71
LIGHTING COST POTENTIAL 71
HEATING COST CURRENT 809
HEATING COST POTENTIAL 577
HOT WATER COST CURRENT 312
HOT WATER COST POTENTIAL 190
TOTAL FLOOR AREA 93
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Room thermostat only
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Air source heat pump, radiators, electric
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Very Good
MAINHEATCONT DESCRIPTION Room thermostat only
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.6
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 3 Council House, Highgate, Leverton
LOCAL AUTHORITY LABEL Boston
CONSTITUENCY LABEL Boston and Skegness
POSTTOWN BOSTON
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2021-10-29 14:52:18
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 200004477905
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2021.csv
COUNTRY England
REGION E12000004
Address display
Nation ew