Energy Performance Certificate

Brookside, Pickburn Lane, Pickburn, DN5 7XD

EPC Report

Energy rating

Current: 45 E | Potential: 60 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 45 E Current: 45 E 60 D Potential: 60 D

Environmental impact (CO₂)

Current: 64 | Potential: 72
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 64 Current: 64 72 Potential: 72
Field Value
LMK KEY 9370-2274-5590-2825-2645
ADDRESS1 Brookside
ADDRESS2 Pickburn Lane
ADDRESS3 Pickburn
POSTCODE DN5 7XD
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 45
POTENTIAL ENERGY EFFICIENCY 60
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2025-11-24
LOCAL AUTHORITY E08000017
CONSTITUENCY E14001200
COUNTY
LODGEMENT DATE 2025-11-24
TRANSACTION TYPE Grant scheme
ENVIRONMENT IMPACT CURRENT 64
ENVIRONMENT IMPACT POTENTIAL 72
ENERGY CONSUMPTION CURRENT 186
ENERGY CONSUMPTION POTENTIAL 136
CO2 EMISSIONS CURRENT 4.6
CO2 EMISS CURR PER FLOOR AREA 36
CO2 EMISSIONS POTENTIAL 3.4
LIGHTING COST CURRENT 100
LIGHTING COST POTENTIAL 100
HEATING COST CURRENT 1642
HEATING COST POTENTIAL 1265
HOT WATER COST CURRENT 298
HOT WATER COST POTENTIAL 260
TOTAL FLOOR AREA 126
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 75
NUMBER OPEN FIREPLACES
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, LPG
MAINHEAT ENERGY EFF Poor
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Below average lighting efficiency
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL LPG (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.36
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Brookside, Pickburn Lane, Pickburn
LOCAL AUTHORITY LABEL Doncaster
CONSTITUENCY LABEL Doncaster North
POSTTOWN DONCASTER
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2025-11-24 13:31:05
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 44
LOW ENERGY FIXED LIGHT COUNT 33
UPRN 100050761531
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000003
Address display
Nation ew