Energy Performance Certificate
14 East Stour Court, Mabledon Avenue, TN24 8FH
Energy rating
Current: 82 B | Potential: 82 B
Environmental impact (CO₂)
Current: 85
| Potential: 85
| Field | Value |
|---|---|
| LMK KEY | 9360-2829-9000-2822-7271 |
| ADDRESS1 | 14 East Stour Court |
| ADDRESS2 | Mabledon Avenue |
| ADDRESS3 | — |
| POSTCODE | TN24 8FH |
| BUILDING REFERENCE NUMBER | — |
| CURRENT ENERGY RATING | B |
| POTENTIAL ENERGY RATING | B |
| CURRENT ENERGY EFFICIENCY | 82 |
| POTENTIAL ENERGY EFFICIENCY | 82 |
| PROPERTY TYPE | Flat |
| BUILT FORM | Mid-Terrace |
| INSPECTION DATE | 2022-10-21 |
| LOCAL AUTHORITY | E07000105 |
| CONSTITUENCY | E14001069 |
| COUNTY | — |
| LODGEMENT DATE | 2022-11-04 |
| TRANSACTION TYPE | None of the above |
| ENVIRONMENT IMPACT CURRENT | 85 |
| ENVIRONMENT IMPACT POTENTIAL | 85 |
| ENERGY CONSUMPTION CURRENT | 108 |
| ENERGY CONSUMPTION POTENTIAL | 108 |
| CO2 EMISSIONS CURRENT | 1.0 |
| CO2 EMISS CURR PER FLOOR AREA | 19 |
| CO2 EMISSIONS POTENTIAL | 1.0 |
| LIGHTING COST CURRENT | 59 |
| LIGHTING COST POTENTIAL | 59 |
| HEATING COST CURRENT | 146 |
| HEATING COST POTENTIAL | 146 |
| HOT WATER COST CURRENT | 97 |
| HOT WATER COST POTENTIAL | 97 |
| TOTAL FLOOR AREA | 55 |
| ENERGY TARIFF | Single |
| MAINS GAS FLAG | Y |
| FLOOR LEVEL | 3 |
| FLAT TOP STOREY | Y |
| FLAT STOREY COUNT | 1 |
| MAIN HEATING CONTROLS | Charging system linked to use of community heating, programmer and at least two room thermostats |
| MULTI GLAZE PROPORTION | 100 |
| GLAZED TYPE | triple glazing |
| GLAZED AREA | Normal |
| EXTENSION COUNT | 0 |
| NUMBER HABITABLE ROOMS | 2 |
| NUMBER HEATED ROOMS | 2 |
| LOW ENERGY LIGHTING | 100 |
| NUMBER OPEN FIREPLACES | 0 |
| HOTWATER DESCRIPTION | Community scheme |
| HOT WATER ENERGY EFF | Good |
| HOT WATER ENV EFF | Good |
| FLOOR DESCRIPTION | (another dwelling below) |
| FLOOR ENERGY EFF | N/A |
| FLOOR ENV EFF | N/A |
| WINDOWS DESCRIPTION | Fully triple glazed |
| WINDOWS ENERGY EFF | Good |
| WINDOWS ENV EFF | Good |
| WALLS DESCRIPTION | Timber frame, as built, insulated (assumed) |
| WALLS ENERGY EFF | Very Good |
| WALLS ENV EFF | Very Good |
| SECONDHEAT DESCRIPTION | None |
| SHEATING ENERGY EFF | N/A |
| SHEATING ENV EFF | N/A |
| ROOF DESCRIPTION | Pitched, insulated (assumed) |
| ROOF ENERGY EFF | Good |
| ROOF ENV EFF | Good |
| MAINHEAT DESCRIPTION | Community scheme |
| MAINHEAT ENERGY EFF | Good |
| MAINHEAT ENV EFF | Good |
| MAINHEATCONT DESCRIPTION | Charging system linked to use of community heating, programmer and at least two room thermostats |
| MAINHEATC ENERGY EFF | Good |
| MAINHEATC ENV EFF | Good |
| LIGHTING DESCRIPTION | Low energy lighting in all fixed outlets |
| LIGHTING ENERGY EFF | Very Good |
| LIGHTING ENV EFF | Very Good |
| MAIN FUEL | mains gas (community) |
| WIND TURBINE COUNT | 0 |
| HEAT LOSS CORRIDOR | heated corridor |
| UNHEATED CORRIDOR LENGTH | — |
| FLOOR HEIGHT | 2.44 |
| PHOTO SUPPLY | 0 |
| SOLAR WATER HEATING FLAG | N |
| MECHANICAL VENTILATION | natural |
| ADDRESS | 14 East Stour Court, Mabledon Avenue |
| LOCAL AUTHORITY LABEL | Ashford |
| CONSTITUENCY LABEL | Ashford |
| POSTTOWN | ASHFORD |
| CONSTRUCTION AGE BAND | England and Wales: 2012 onwards |
| LODGEMENT DATETIME | 2022-11-04 09:55:36 |
| TENURE | rented (social) |
| FIXED LIGHTING OUTLETS COUNT | 14 |
| LOW ENERGY FIXED LIGHT COUNT | 14 |
| UPRN | 10012876849 |
| UPRN SOURCE | Energy Assessor |
| REPORT TYPE | 2 |
| Source file | certificates-2022.csv |
| COUNTRY | England |
| REGION | E12000008 |
| Address display | — |
| Nation | ew |