Energy Performance Certificate

26 Millview Court, Lever Lane, SS4 1DH

EPC Report

Energy rating

Current: 78 C | Potential: 80 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 78 C Current: 78 C 80 C Potential: 80 C

Environmental impact (CO₂)

Current: 82 | Potential: 84
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 82 Current: 82 84 Potential: 84
Field Value
LMK KEY 9350-2990-0300-2997-1005
ADDRESS1 26 Millview Court
ADDRESS2 Lever Lane
ADDRESS3
POSTCODE SS4 1DH
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 78
POTENTIAL ENERGY EFFICIENCY 80
PROPERTY TYPE Flat
BUILT FORM Enclosed Mid-Terrace
INSPECTION DATE 2023-10-10
LOCAL AUTHORITY E07000075
CONSTITUENCY E14001501
COUNTY
LODGEMENT DATE 2023-10-10
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 82
ENVIRONMENT IMPACT POTENTIAL 84
ENERGY CONSUMPTION CURRENT 161
ENERGY CONSUMPTION POTENTIAL 144
CO2 EMISSIONS CURRENT 1.0
CO2 EMISS CURR PER FLOOR AREA 28
CO2 EMISSIONS POTENTIAL 0.9
LIGHTING COST CURRENT 95
LIGHTING COST POTENTIAL 68
HEATING COST CURRENT 267
HEATING COST POTENTIAL 234
HOT WATER COST CURRENT 251
HOT WATER COST POTENTIAL 251
TOTAL FLOOR AREA 37
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Flat rate charging, TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 60
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Community scheme
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Community scheme
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Flat rate charging, TRVs
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 60% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.36
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 26 Millview Court, Lever Lane
LOCAL AUTHORITY LABEL Rochford
CONSTITUENCY LABEL Southend East and Rochford
POSTTOWN ROCHFORD
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2023-10-10 10:11:35
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 5
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100091596729
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2023.csv
COUNTRY England
REGION E12000006
Address display
Nation ew