Energy Performance Certificate

2 Pickhurst Mead, BR2 7QR

EPC Report

Energy rating

Current: 47 E | Potential: 73 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 47 E Current: 47 E 73 C Potential: 73 C

Environmental impact (CO₂)

Current: 39 | Potential: 65
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 39 Current: 39 65 Potential: 65
Field Value
LMK KEY 9350-2967-9290-2222-5221
ADDRESS1 2 Pickhurst Mead
ADDRESS2
ADDRESS3
POSTCODE BR2 7QR
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 47
POTENTIAL ENERGY EFFICIENCY 73
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2022-11-23
LOCAL AUTHORITY E09000006
CONSTITUENCY E14001137
COUNTY
LODGEMENT DATE 2022-11-23
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 39
ENVIRONMENT IMPACT POTENTIAL 65
ENERGY CONSUMPTION CURRENT 351
ENERGY CONSUMPTION POTENTIAL 173
CO2 EMISSIONS CURRENT 6.9
CO2 EMISS CURR PER FLOOR AREA 62
CO2 EMISSIONS POTENTIAL 3.4
LIGHTING COST CURRENT 117
LIGHTING COST POTENTIAL 89
HEATING COST CURRENT 1109
HEATING COST POTENTIAL 759
HOT WATER COST CURRENT 145
HOT WATER COST POTENTIAL 80
TOTAL FLOOR AREA 111
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 69
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 69% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.51
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 2 Pickhurst Mead
LOCAL AUTHORITY LABEL Bromley
CONSTITUENCY LABEL Bromley and Biggin Hill
POSTTOWN BROMLEY
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2022-11-23 22:06:01
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 16
LOW ENERGY FIXED LIGHT COUNT 11
UPRN 100020410250
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000007
Address display
Nation ew