Energy Performance Certificate

7 Herlington House, Benyon Grove, Orton Malborne, PE2 5XS

EPC Report

Energy rating

Current: 74 C | Potential: 83 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 74 C Current: 74 C 83 B Potential: 83 B

Environmental impact (CO₂)

Current: 72 | Potential: 73
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 72 Current: 72 73 Potential: 73
Field Value
LMK KEY 9343-2883-7526-9906-6245
ADDRESS1 7 Herlington House
ADDRESS2 Benyon Grove
ADDRESS3 Orton Malborne
POSTCODE PE2 5XS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 74
POTENTIAL ENERGY EFFICIENCY 83
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2016-12-07
LOCAL AUTHORITY E06000031
CONSTITUENCY E14001401
COUNTY
LODGEMENT DATE 2016-12-08
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 72
ENVIRONMENT IMPACT POTENTIAL 73
ENERGY CONSUMPTION CURRENT 366
ENERGY CONSUMPTION POTENTIAL 353
CO2 EMISSIONS CURRENT 1.4
CO2 EMISS CURR PER FLOOR AREA 62
CO2 EMISSIONS POTENTIAL 1.3
LIGHTING COST CURRENT 26
LIGHTING COST POTENTIAL 29
HEATING COST CURRENT 158
HEATING COST POTENTIAL 74
HOT WATER COST CURRENT 146
HOT WATER COST POTENTIAL 110
TOTAL FLOOR AREA 22
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer and appliance thermostats
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 1
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 67
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Room heaters, electric
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION Programmer and appliance thermostats
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 67% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 3.35
FLOOR HEIGHT 2.26
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 7 Herlington House, Benyon Grove, Orton Malborne
LOCAL AUTHORITY LABEL Peterborough
CONSTITUENCY LABEL North West Cambridgeshire
POSTTOWN PETERBOROUGH
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2016-12-08 20:57:15
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 6
LOW ENERGY FIXED LIGHT COUNT 4
UPRN 10093492880
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000006
Address display
Nation ew