Energy Performance Certificate

3, Elker Lane, Billington, BB7 9HZ

EPC Report

Energy rating

Current: 55 D | Potential: 87 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 55 D Current: 55 D 87 B Potential: 87 B

Environmental impact (CO₂)

Current: 51 | Potential: 87
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 51 Current: 51 87 Potential: 87
Field Value
LMK KEY 9178-3046-7272-1194-6994
ADDRESS1 3, Elker Lane
ADDRESS2 Billington
ADDRESS3
POSTCODE BB7 9HZ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 55
POTENTIAL ENERGY EFFICIENCY 87
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2014-02-13
LOCAL AUTHORITY E07000124
CONSTITUENCY E14001443
COUNTY
LODGEMENT DATE 2014-02-16
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 51
ENVIRONMENT IMPACT POTENTIAL 87
ENERGY CONSUMPTION CURRENT 283
ENERGY CONSUMPTION POTENTIAL 70
CO2 EMISSIONS CURRENT 4.9
CO2 EMISS CURR PER FLOOR AREA 54
CO2 EMISSIONS POTENTIAL 1.3
LIGHTING COST CURRENT 95
LIGHTING COST POTENTIAL 53
HEATING COST CURRENT 805
HEATING COST POTENTIAL 484
HOT WATER COST CURRENT 190
HOT WATER COST POTENTIAL 82
TOTAL FLOOR AREA 89
ENERGY TARIFF Unknown
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 75
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 20
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Partial double glazing
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 20% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.74
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 3, Elker Lane, Billington
LOCAL AUTHORITY LABEL Ribble Valley
CONSTITUENCY LABEL Ribble Valley
POSTTOWN CLITHEROE
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2014-02-16 19:28:41
TENURE Owner-occupied
FIXED LIGHTING OUTLETS COUNT 15
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100010585134
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2014.csv
COUNTRY England
REGION E12000002
Address display
Nation ew