Energy Performance Certificate

2 Carr Field, Bamber Bridge, PR5 8BS

EPC Report

Energy rating

Current: 94 A | Potential: 98 A
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 94 A Current: 94 A 98 A Potential: 98 A

Environmental impact (CO₂)

Current: 90 | Potential: 96
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 90 Current: 90 96 Potential: 96
Field Value
LMK KEY 9159-3029-3208-4797-1204
ADDRESS1 2 Carr Field
ADDRESS2 Bamber Bridge
ADDRESS3
POSTCODE PR5 8BS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING A
POTENTIAL ENERGY RATING A
CURRENT ENERGY EFFICIENCY 94
POTENTIAL ENERGY EFFICIENCY 98
PROPERTY TYPE Bungalow
BUILT FORM Detached
INSPECTION DATE 2023-08-15
LOCAL AUTHORITY E07000118
CONSTITUENCY E14001170
COUNTY
LODGEMENT DATE 2023-08-21
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 90
ENVIRONMENT IMPACT POTENTIAL 96
ENERGY CONSUMPTION CURRENT 63
ENERGY CONSUMPTION POTENTIAL 23
CO2 EMISSIONS CURRENT 0.9
CO2 EMISS CURR PER FLOOR AREA 12
CO2 EMISSIONS POTENTIAL 0.4
LIGHTING COST CURRENT 116
LIGHTING COST POTENTIAL 116
HEATING COST CURRENT 1080
HEATING COST POTENTIAL 921
HOT WATER COST CURRENT 230
HOT WATER COST POTENTIAL 157
TOTAL FLOOR AREA 72
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, insulated (assumed)
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY 50
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 2 Carr Field, Bamber Bridge
LOCAL AUTHORITY LABEL Chorley
CONSTITUENCY LABEL Chorley
POSTTOWN PRESTON
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2023-08-21 05:42:18
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100010392055
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2023.csv
COUNTRY England
REGION E12000002
Address display
Nation ew