Energy Performance Certificate

Cherry Dawn, Gunby Road, Orby, PE24 5HT

EPC Report

Energy rating

Current: 56 D | Potential: 103 A
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 56 D Current: 56 D 103 A Potential: 103 A

Environmental impact (CO₂)

Current: 49 | Potential: 94
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 49 Current: 49 94 Potential: 94
Field Value
LMK KEY 9141-2804-7624-9905-4281
ADDRESS1 Cherry Dawn
ADDRESS2 Gunby Road
ADDRESS3 Orby
POSTCODE PE24 5HT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING A
CURRENT ENERGY EFFICIENCY 56
POTENTIAL ENERGY EFFICIENCY 103
PROPERTY TYPE Bungalow
BUILT FORM Detached
INSPECTION DATE 2015-12-04
LOCAL AUTHORITY E07000137
CONSTITUENCY E14001114
COUNTY
LODGEMENT DATE 2015-12-05
TRANSACTION TYPE FiT application
ENVIRONMENT IMPACT CURRENT 49
ENVIRONMENT IMPACT POTENTIAL 94
ENERGY CONSUMPTION CURRENT 176
ENERGY CONSUMPTION POTENTIAL -86
CO2 EMISSIONS CURRENT 4.5
CO2 EMISS CURR PER FLOOR AREA 59
CO2 EMISSIONS POTENTIAL 0.3
LIGHTING COST CURRENT 67
LIGHTING COST POTENTIAL 50
HEATING COST CURRENT 1046
HEATING COST POTENTIAL 620
HOT WATER COST CURRENT 221
HOT WATER COST POTENTIAL 179
TOTAL FLOOR AREA 76
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 67
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Timber frame, as built, partial insulation (assumed)
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, LPG
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 67% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.28
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Cherry Dawn, Gunby Road, Orby
LOCAL AUTHORITY LABEL East Lindsey
CONSTITUENCY LABEL Boston and Skegness
POSTTOWN SKEGNESS
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2015-12-05 20:10:08
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 6
UPRN 10002120648
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000004
Address display
Nation ew