Energy Performance Certificate

9, Ffordd Pennant, Mostyn, CH8 9NU

EPC Report

Energy rating

Current: 28 F | Potential: 54 E
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 28 F Current: 28 F 54 E Potential: 54 E

Environmental impact (CO₂)

Current: 56 | Potential: 76
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 56 Current: 56 76 Potential: 76
Field Value
LMK KEY 9138-9043-6236-9221-8934
ADDRESS1 9, Ffordd Pennant
ADDRESS2 Mostyn
ADDRESS3
POSTCODE CH8 9NU
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING E
CURRENT ENERGY EFFICIENCY 28
POTENTIAL ENERGY EFFICIENCY 54
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2019-06-17
LOCAL AUTHORITY W06000005
CONSTITUENCY W07000094
COUNTY
LODGEMENT DATE 2019-06-19
TRANSACTION TYPE None of the above
ENVIRONMENT IMPACT CURRENT 56
ENVIRONMENT IMPACT POTENTIAL 76
ENERGY CONSUMPTION CURRENT 234
ENERGY CONSUMPTION POTENTIAL 114
CO2 EMISSIONS CURRENT 4.6
CO2 EMISS CURR PER FLOOR AREA 49
CO2 EMISSIONS POTENTIAL 2.4
LIGHTING COST CURRENT 66
LIGHTING COST POTENTIAL 66
HEATING COST CURRENT 1554
HEATING COST POTENTIAL 1140
HOT WATER COST CURRENT 290
HOT WATER COST POTENTIAL 184
TOTAL FLOOR AREA 94
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, LPG
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL bottled LPG
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.5
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 9, Ffordd Pennant, Mostyn
LOCAL AUTHORITY LABEL Flintshire
CONSTITUENCY LABEL Clwyd East
POSTTOWN HOLYWELL
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2019-06-19 09:12:10
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 12
LOW ENERGY FIXED LIGHT COUNT 12
UPRN 100100240421
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew