Energy Performance Certificate

C75, Albion Riverside Building, 8 Hester Road, SW11 4AR

EPC Report

Energy rating

Current: 87 B | Potential: 87 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 87 B Current: 87 B 87 B Potential: 87 B

Environmental impact (CO₂)

Current: 94 | Potential: 94
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 94 Current: 94 94 Potential: 94
Field Value
LMK KEY 9111-3062-8205-2626-7200
ADDRESS1 C75
ADDRESS2 Albion Riverside Building
ADDRESS3 8 Hester Road
POSTCODE SW11 4AR
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING B
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 87
POTENTIAL ENERGY EFFICIENCY 87
PROPERTY TYPE Flat
BUILT FORM Not Recorded
INSPECTION DATE 2026-05-19
LOCAL AUTHORITY E09000032
CONSTITUENCY E14001081
COUNTY
LODGEMENT DATE 2026-05-21
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 94
ENVIRONMENT IMPACT POTENTIAL 94
ENERGY CONSUMPTION CURRENT 45
ENERGY CONSUMPTION POTENTIAL 45
CO2 EMISSIONS CURRENT 0.8
CO2 EMISS CURR PER FLOOR AREA 4
CO2 EMISSIONS POTENTIAL 0.8
LIGHTING COST CURRENT 120
LIGHTING COST POTENTIAL 120
HEATING COST CURRENT 450
HEATING COST POTENTIAL 450
HOT WATER COST CURRENT 452
HOT WATER COST POTENTIAL 452
TOTAL FLOOR AREA 185
ENERGY TARIFF Unknown
MAINS GAS FLAG Y
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Time and temperature zone control
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Very Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION System built, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Warm air, Electricaire
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Very Good
MAINHEATCONT DESCRIPTION Time and temperature zone control
MAINHEATC ENERGY EFF Very Good
MAINHEATC ENV EFF Very Good
LIGHTING DESCRIPTION Good lighting efficiency
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 4.87
FLOOR HEIGHT 2.41
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS C75, Albion Riverside Building, 8 Hester Road
LOCAL AUTHORITY LABEL Wandsworth
CONSTITUENCY LABEL Battersea
POSTTOWN LONDON
CONSTRUCTION AGE BAND England and Wales: 2012-2021
LODGEMENT DATETIME 2026-05-21 14:47:35
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 24
LOW ENERGY FIXED LIGHT COUNT 24
UPRN 10008157877
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2026.csv
COUNTRY England
REGION E12000007
Address display
Nation ew