Energy Performance Certificate

22a Station Parade, Uxbridge Road, W5 3LD

EPC Report

Energy rating

Current: 57 D | Potential: 61 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 57 D Current: 57 D 61 D Potential: 61 D

Environmental impact (CO₂)

Current: 50 | Potential: 55
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 50 Current: 50 55 Potential: 55
Field Value
LMK KEY 9099-0201-0807-3214-2900
ADDRESS1 22a Station Parade
ADDRESS2 Uxbridge Road
ADDRESS3
POSTCODE W5 3LD
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 57
POTENTIAL ENERGY EFFICIENCY 61
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2023-11-02
LOCAL AUTHORITY E09000009
CONSTITUENCY E14001207
COUNTY
LODGEMENT DATE 2023-11-09
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 50
ENVIRONMENT IMPACT POTENTIAL 55
ENERGY CONSUMPTION CURRENT 314
ENERGY CONSUMPTION POTENTIAL 280
CO2 EMISSIONS CURRENT 3.9
CO2 EMISS CURR PER FLOOR AREA 55
CO2 EMISSIONS POTENTIAL 3.4
LIGHTING COST CURRENT 129
LIGHTING COST POTENTIAL 129
HEATING COST CURRENT 1628
HEATING COST POTENTIAL 1428
HOT WATER COST CURRENT 238
HOT WATER COST POTENTIAL 238
TOTAL FLOOR AREA 70
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 91
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (other premises below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 91% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.8
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 22a Station Parade, Uxbridge Road
LOCAL AUTHORITY LABEL Ealing
CONSTITUENCY LABEL Ealing Central and Acton
POSTTOWN LONDON
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2023-11-09 15:21:53
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 12130994
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2023.csv
COUNTRY England
REGION E12000007
Address display
Nation ew