Energy Performance Certificate

9, Fieldhead Paddock, Boston Spa, LS23 6SA

EPC Report

Energy rating

Current: 65 D | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 65 D Current: 65 D 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 59 | Potential: 81
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 Current: 59 81 Potential: 81
Field Value
LMK KEY 9098-2013-6255-9593-6944
ADDRESS1 9, Fieldhead Paddock
ADDRESS2 Boston Spa
ADDRESS3
POSTCODE LS23 6SA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 65
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2017-05-11
LOCAL AUTHORITY E08000035
CONSTITUENCY E14001582
COUNTY
LODGEMENT DATE 2017-05-12
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 59
ENVIRONMENT IMPACT POTENTIAL 81
ENERGY CONSUMPTION CURRENT 245
ENERGY CONSUMPTION POTENTIAL 112
CO2 EMISSIONS CURRENT 5.1
CO2 EMISS CURR PER FLOOR AREA 43
CO2 EMISSIONS POTENTIAL 2.3
LIGHTING COST CURRENT 78
LIGHTING COST POTENTIAL 78
HEATING COST CURRENT 849
HEATING COST POTENTIAL 593
HOT WATER COST CURRENT 189
HOT WATER COST POTENTIAL 90
TOTAL FLOOR AREA 117
ENERGY TARIFF dual
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Time and temperature zone control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, partial insulation (assumed)
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and underfloor heating, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Time and temperature zone control
MAINHEATC ENERGY EFF Very Good
MAINHEATC ENV EFF Very Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.31
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 9, Fieldhead Paddock, Boston Spa
LOCAL AUTHORITY LABEL Leeds
CONSTITUENCY LABEL Wetherby and Easingwold
POSTTOWN WETHERBY
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2017-05-12 10:58:31
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 31
LOW ENERGY FIXED LIGHT COUNT 31
UPRN 72400290
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2017.csv
COUNTRY England
REGION E12000003
Address display
Nation ew