Energy Performance Certificate

35, Clandon Close, B14 5QL

EPC Report

Energy rating

Current: 27 F | Potential: 85 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 27 F Current: 27 F 85 B Potential: 85 B

Environmental impact (CO₂)

Current: 37 | Potential: 65
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 37 Current: 37 65 Potential: 65
Field Value
LMK KEY 9056-2865-6491-9026-4281
ADDRESS1 35, Clandon Close
ADDRESS2
ADDRESS3
POSTCODE B14 5QL
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 27
POTENTIAL ENERGY EFFICIENCY 85
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2016-11-25
LOCAL AUTHORITY E08000025
CONSTITUENCY E14001099
COUNTY
LODGEMENT DATE 2016-11-28
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 37
ENVIRONMENT IMPACT POTENTIAL 65
ENERGY CONSUMPTION CURRENT 507
ENERGY CONSUMPTION POTENTIAL 258
CO2 EMISSIONS CURRENT 5.9
CO2 EMISS CURR PER FLOOR AREA 86
CO2 EMISSIONS POTENTIAL 3.0
LIGHTING COST CURRENT 89
LIGHTING COST POTENTIAL 52
HEATING COST CURRENT 1340
HEATING COST POTENTIAL 501
HOT WATER COST CURRENT 313
HOT WATER COST POTENTIAL 90
TOTAL FLOOR AREA 68
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS No thermostatic control of room temperature
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 11
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Room heaters, electric
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION No thermostatic control of room temperature
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 11% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.32
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 35, Clandon Close
LOCAL AUTHORITY LABEL Birmingham
CONSTITUENCY LABEL Birmingham Selly Oak
POSTTOWN BIRMINGHAM
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2016-11-28 10:12:55
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 100070326800
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000005
Address display
Nation ew