Energy Performance Certificate

62, Connaught Road, BN3 3WB

EPC Report

Energy rating

Current: 58 D | Potential: 77 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 58 D Current: 58 D 77 C Potential: 77 C

Environmental impact (CO₂)

Current: 52 | Potential: 78
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 52 Current: 52 78 Potential: 78
Field Value
LMK KEY 9047-2870-7908-9796-1601
ADDRESS1 62, Connaught Road
ADDRESS2
ADDRESS3
POSTCODE BN3 3WB
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 58
POTENTIAL ENERGY EFFICIENCY 77
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2016-10-10
LOCAL AUTHORITY E06000043
CONSTITUENCY E14001296
COUNTY
LODGEMENT DATE 2016-10-11
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 52
ENVIRONMENT IMPACT POTENTIAL 78
ENERGY CONSUMPTION CURRENT 327
ENERGY CONSUMPTION POTENTIAL 152
CO2 EMISSIONS CURRENT 3.6
CO2 EMISS CURR PER FLOOR AREA 58
CO2 EMISSIONS POTENTIAL 1.7
LIGHTING COST CURRENT 81
LIGHTING COST POTENTIAL 45
HEATING COST CURRENT 660
HEATING COST POTENTIAL 308
HOT WATER COST CURRENT 107
HOT WATER COST POTENTIAL 96
TOTAL FLOOR AREA 63
ENERGY TARIFF Unknown
MAINS GAS FLAG Y
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 20
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 18
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Some double glazing
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 18% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 3.05
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 62, Connaught Road
LOCAL AUTHORITY LABEL Brighton and Hove
CONSTITUENCY LABEL Hove and Portslade
POSTTOWN HOVE
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2016-10-11 12:55:03
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 2
UPRN 22023445
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2016.csv
COUNTRY England
REGION E12000008
Address display
Nation ew