Energy Performance Certificate

19 Foster, Millsands, S3 8ND

EPC Report

Energy rating

Current: 81 B | Potential: 86 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 81 B Current: 81 B 86 B Potential: 86 B

Environmental impact (CO₂)

Current: 78 | Potential: 79
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 78 Current: 78 79 Potential: 79
Field Value
LMK KEY 9032-3002-2202-0675-1204
ADDRESS1 19 Foster
ADDRESS2 Millsands
ADDRESS3
POSTCODE S3 8ND
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING B
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 81
POTENTIAL ENERGY EFFICIENCY 86
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2025-02-17
LOCAL AUTHORITY E08000039
CONSTITUENCY E14001467
COUNTY
LODGEMENT DATE 2025-02-17
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 78
ENVIRONMENT IMPACT POTENTIAL 79
ENERGY CONSUMPTION CURRENT 172
ENERGY CONSUMPTION POTENTIAL 167
CO2 EMISSIONS CURRENT 1.7
CO2 EMISS CURR PER FLOOR AREA 29
CO2 EMISSIONS POTENTIAL 1.7
LIGHTING COST CURRENT 138
LIGHTING COST POTENTIAL 83
HEATING COST CURRENT 226
HEATING COST POTENTIAL 144
HOT WATER COST CURRENT 307
HOT WATER COST POTENTIAL 246
TOTAL FLOOR AREA 60
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL 2
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer and appliance thermostats
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 40
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Room heaters, electric
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION Programmer and appliance thermostats
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 40% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.36
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 19 Foster, Millsands
LOCAL AUTHORITY LABEL Sheffield
CONSTITUENCY LABEL Sheffield Central
POSTTOWN SHEFFIELD
CONSTRUCTION AGE BAND England and Wales: 2003-2006
LODGEMENT DATETIME 2025-02-17 11:37:10
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 5
LOW ENERGY FIXED LIGHT COUNT 2
UPRN 200002741624
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2025.csv
COUNTRY England
REGION E12000003
Address display
Nation ew