Energy Performance Certificate

5, Perth Road, N4 3HB

EPC Report

Energy rating

Current: 65 D | Potential: 80 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 65 D Current: 65 D 80 C Potential: 80 C

Environmental impact (CO₂)

Current: 58 | Potential: 77
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 58 Current: 58 77 Potential: 77
Field Value
LMK KEY 8982-6223-7130-0405-8922
ADDRESS1 5, Perth Road
ADDRESS2
ADDRESS3
POSTCODE N4 3HB
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 65
POTENTIAL ENERGY EFFICIENCY 80
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2012-07-25
LOCAL AUTHORITY E09000014
CONSTITUENCY E14001293
COUNTY
LODGEMENT DATE 2012-07-27
TRANSACTION TYPE not sale or rental
ENVIRONMENT IMPACT CURRENT 58
ENVIRONMENT IMPACT POTENTIAL 77
ENERGY CONSUMPTION CURRENT 201
ENERGY CONSUMPTION POTENTIAL 105
CO2 EMISSIONS CURRENT 5.0
CO2 EMISS CURR PER FLOOR AREA 39
CO2 EMISSIONS POTENTIAL 2.6
LIGHTING COST CURRENT 113
LIGHTING COST POTENTIAL 68
HEATING COST CURRENT 999
HEATING COST POTENTIAL 651
HOT WATER COST CURRENT 116
HOT WATER COST POTENTIAL 80
TOTAL FLOOR AREA 127
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 3
MAIN HEATING CONTROLS Programmer, TRVs and boiler energy manager
MULTI GLAZE PROPORTION
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 3
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 33
NUMBER OPEN FIREPLACES 3
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and boiler energy manager
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 33% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 3.02
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 5, Perth Road
LOCAL AUTHORITY LABEL Haringey
CONSTITUENCY LABEL Hornsey and Friern Barnet
POSTTOWN LONDON
CONSTRUCTION AGE BAND England and Wales: before 1900
LODGEMENT DATETIME 2012-07-27 15:10:12
TENURE
FIXED LIGHTING OUTLETS COUNT 21
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100021213783
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2012.csv
COUNTRY England
REGION E12000007
Address display
Nation ew