Energy Performance Certificate

Flat 15 Pinner House, Church Lane, HA5 3AA

EPC Report

Energy rating

Current: 74 C | Potential: 83 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 74 C Current: 74 C 83 B Potential: 83 B

Environmental impact (CO₂)

Current: 72 | Potential: 75
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 72 Current: 72 75 Potential: 75
Field Value
LMK KEY 8973-7420-5639-7452-8992
ADDRESS1 Flat 15 Pinner House
ADDRESS2 Church Lane
ADDRESS3
POSTCODE HA5 3AA
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 74
POTENTIAL ENERGY EFFICIENCY 83
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2017-10-12
LOCAL AUTHORITY E09000015
CONSTITUENCY E14001454
COUNTY
LODGEMENT DATE 2017-10-12
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 72
ENVIRONMENT IMPACT POTENTIAL 75
ENERGY CONSUMPTION CURRENT 320
ENERGY CONSUMPTION POTENTIAL 280
CO2 EMISSIONS CURRENT 1.4
CO2 EMISS CURR PER FLOOR AREA 54
CO2 EMISSIONS POTENTIAL 1.2
LIGHTING COST CURRENT 30
LIGHTING COST POTENTIAL 30
HEATING COST CURRENT 163
HEATING COST POTENTIAL 71
HOT WATER COST CURRENT 132
HOT WATER COST POTENTIAL 114
TOTAL FLOOR AREA 25
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Room thermostat only
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 1
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 75
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Electric ceiling heating
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Room thermostat only
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 75% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR heated corridor
UNHEATED CORRIDOR LENGTH 0
FLOOR HEIGHT 2.27
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Flat 15 Pinner House, Church Lane
LOCAL AUTHORITY LABEL Harrow
CONSTITUENCY LABEL Ruislip, Northwood and Pinner
POSTTOWN PINNER
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2017-10-12 18:56:06
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 4
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100023035784
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2017.csv
COUNTRY England
REGION E12000007
Address display
Nation ew