Energy Performance Certificate

25, Penrith Road, BH5 1LT

EPC Report

Energy rating

Current: 29 F | Potential: 68 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 29 F Current: 29 F 68 D Potential: 68 D

Environmental impact (CO₂)

Current: 22 | Potential: 57
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 22 Current: 22 57 Potential: 57
Field Value
LMK KEY 8945-7629-3250-1151-4996
ADDRESS1 25, Penrith Road
ADDRESS2
ADDRESS3
POSTCODE BH5 1LT
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 29
POTENTIAL ENERGY EFFICIENCY 68
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2015-01-19
LOCAL AUTHORITY E06000058
CONSTITUENCY E14001115
COUNTY
LODGEMENT DATE 2015-01-20
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 22
ENVIRONMENT IMPACT POTENTIAL 57
ENERGY CONSUMPTION CURRENT 451
ENERGY CONSUMPTION POTENTIAL 185
CO2 EMISSIONS CURRENT 22
CO2 EMISS CURR PER FLOOR AREA 80
CO2 EMISSIONS POTENTIAL 8.9
LIGHTING COST CURRENT 160
LIGHTING COST POTENTIAL 105
HEATING COST CURRENT 3805
HEATING COST POTENTIAL 1756
HOT WATER COST CURRENT 261
HOT WATER COST POTENTIAL 159
TOTAL FLOOR AREA 272
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 0
GLAZED TYPE not defined
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 10
NUMBER HEATED ROOMS 10
LOW ENERGY LIGHTING 44
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system, no cylinder thermostat
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Single glazed
WINDOWS ENERGY EFF Very Poor
WINDOWS ENV EFF Very Poor
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 44% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.55
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 25, Penrith Road
LOCAL AUTHORITY LABEL Bournemouth, Christchurch and Poole
CONSTITUENCY LABEL Bournemouth East
POSTTOWN BOURNEMOUTH
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2015-01-20 15:34:27
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 50
LOW ENERGY FIXED LIGHT COUNT 22
UPRN 100040758101
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000009
Address display
Nation ew