Energy Performance Certificate

7a Robin Parade, The Broadway, Farnham Common, SL2 3QL

EPC Report

Energy rating

Current: 61 D | Potential: 66 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 61 D Current: 61 D 66 D Potential: 66 D

Environmental impact (CO₂)

Current: 54 | Potential: 61
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 54 Current: 54 61 Potential: 61
Field Value
LMK KEY 8897-0856-2029-8097-5083
ADDRESS1 7a Robin Parade
ADDRESS2 The Broadway
ADDRESS3 Farnham Common
POSTCODE SL2 3QL
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 61
POTENTIAL ENERGY EFFICIENCY 66
PROPERTY TYPE Maisonette
BUILT FORM End-Terrace
INSPECTION DATE 2018-10-15
LOCAL AUTHORITY E06000060
CONSTITUENCY E14001082
COUNTY
LODGEMENT DATE 2018-10-16
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 54
ENVIRONMENT IMPACT POTENTIAL 61
ENERGY CONSUMPTION CURRENT 263
ENERGY CONSUMPTION POTENTIAL 223
CO2 EMISSIONS CURRENT 4.6
CO2 EMISS CURR PER FLOOR AREA 46
CO2 EMISSIONS POTENTIAL 3.9
LIGHTING COST CURRENT 100
LIGHTING COST POTENTIAL 74
HEATING COST CURRENT 775
HEATING COST POTENTIAL 663
HOT WATER COST CURRENT 103
HOT WATER COST POTENTIAL 103
TOTAL FLOOR AREA 99
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 64
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (other premises below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 64% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.39
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 7a Robin Parade, The Broadway, Farnham Common
LOCAL AUTHORITY LABEL Buckinghamshire
CONSTITUENCY LABEL Beaconsfield
POSTTOWN SLOUGH
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2018-10-16 11:07:49
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 10003237401
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY England
REGION E12000008
Address display
Nation ew