Energy Performance Certificate

9, Puckleside, Langdon Hills, SS16 5XD

EPC Report

Energy rating

Current: 49 E | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 49 E Current: 49 E 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 54 | Potential: 84
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 54 Current: 54 84 Potential: 84
Field Value
LMK KEY 8833-7728-0060-9680-4996
ADDRESS1 9, Puckleside
ADDRESS2 Langdon Hills
ADDRESS3
POSTCODE SS16 5XD
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 49
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2017-08-10
LOCAL AUTHORITY E07000066
CONSTITUENCY E14001480
COUNTY
LODGEMENT DATE 2018-07-11
TRANSACTION TYPE RHI application
ENVIRONMENT IMPACT CURRENT 54
ENVIRONMENT IMPACT POTENTIAL 84
ENERGY CONSUMPTION CURRENT 295
ENERGY CONSUMPTION POTENTIAL 91
CO2 EMISSIONS CURRENT 4.2
CO2 EMISS CURR PER FLOOR AREA 50
CO2 EMISSIONS POTENTIAL 1.3
LIGHTING COST CURRENT 102
LIGHTING COST POTENTIAL 60
HEATING COST CURRENT 793
HEATING COST POTENTIAL 406
HOT WATER COST CURRENT 445
HOT WATER COST POTENTIAL 259
TOTAL FLOOR AREA 84
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, no room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 30
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Air source heat pump, radiators, electric
MAINHEAT ENERGY EFF Very Good
MAINHEAT ENV EFF Very Good
MAINHEATCONT DESCRIPTION Programmer, no room thermostat
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 30% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.18
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 9, Puckleside, Langdon Hills
LOCAL AUTHORITY LABEL Basildon
CONSTITUENCY LABEL South Basildon and East Thurrock
POSTTOWN BASILDON
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2018-07-11 13:12:51
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100090258421
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY England
REGION E12000006
Address display
Nation ew