Energy Performance Certificate

22, Campbell Road, BH1 4EP

EPC Report

Energy rating

Current: 63 D | Potential: 76 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 63 D Current: 63 D 76 C Potential: 76 C

Environmental impact (CO₂)

Current: 57 | Potential: 74
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 57 Current: 57 74 Potential: 74
Field Value
LMK KEY 8802-3843-2229-5207-8253
ADDRESS1 22, Campbell Road
ADDRESS2
ADDRESS3
POSTCODE BH1 4EP
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 63
POTENTIAL ENERGY EFFICIENCY 76
PROPERTY TYPE Flat
BUILT FORM Detached
INSPECTION DATE 2015-02-04
LOCAL AUTHORITY E06000058
CONSTITUENCY E14001115
COUNTY
LODGEMENT DATE 2015-02-05
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 57
ENVIRONMENT IMPACT POTENTIAL 74
ENERGY CONSUMPTION CURRENT 235
ENERGY CONSUMPTION POTENTIAL 140
CO2 EMISSIONS CURRENT 4.3
CO2 EMISS CURR PER FLOOR AREA 41
CO2 EMISSIONS POTENTIAL 2.6
LIGHTING COST CURRENT 125
LIGHTING COST POTENTIAL 67
HEATING COST CURRENT 751
HEATING COST POTENTIAL 452
HOT WATER COST CURRENT 117
HOT WATER COST POTENTIAL 118
TOTAL FLOOR AREA 105
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 60
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 11
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Partial double glazing
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 11% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.6
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 22, Campbell Road
LOCAL AUTHORITY LABEL Bournemouth, Christchurch and Poole
CONSTITUENCY LABEL Bournemouth East
POSTTOWN BOURNEMOUTH
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2015-02-05 14:36:41
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 100040721285
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000009
Address display
Nation ew