Energy Performance Certificate

1, Islingbrook, Shenley Brook End, MK5 7EU

EPC Report

Energy rating

Current: 60 D | Potential: 78 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 60 D Current: 60 D 78 C Potential: 78 C

Environmental impact (CO₂)

Current: 55 | Potential: 75
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 55 Current: 55 75 Potential: 75
Field Value
LMK KEY 8800-8591-7929-7297-4243
ADDRESS1 1, Islingbrook
ADDRESS2 Shenley Brook End
ADDRESS3
POSTCODE MK5 7EU
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 60
POTENTIAL ENERGY EFFICIENCY 78
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2014-02-11
LOCAL AUTHORITY E06000042
CONSTITUENCY E14001369
COUNTY
LODGEMENT DATE 2014-02-12
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 55
ENVIRONMENT IMPACT POTENTIAL 75
ENERGY CONSUMPTION CURRENT 225
ENERGY CONSUMPTION POTENTIAL 118
CO2 EMISSIONS CURRENT 5.3
CO2 EMISS CURR PER FLOOR AREA 43
CO2 EMISSIONS POTENTIAL 2.8
LIGHTING COST CURRENT 111
LIGHTING COST POTENTIAL 68
HEATING COST CURRENT 906
HEATING COST POTENTIAL 722
HOT WATER COST CURRENT 164
HOT WATER COST POTENTIAL 87
TOTAL FLOOR AREA 122
ENERGY TARIFF Single
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 37
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, limited insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 37% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.36
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 1, Islingbrook, Shenley Brook End
LOCAL AUTHORITY LABEL Milton Keynes
CONSTITUENCY LABEL Milton Keynes Central
POSTTOWN MILTON KEYNES
CONSTRUCTION AGE BAND England and Wales: 1996-2002
LODGEMENT DATETIME 2014-02-12 10:22:59
TENURE Owner-occupied
FIXED LIGHTING OUTLETS COUNT 19
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 25018173
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2014.csv
COUNTRY England
REGION E12000008
Address display
Nation ew