Energy Performance Certificate

50, Tyddyn Mostyn Estate, LL59 5DS

EPC Report

Energy rating

Current: 48 E | Potential: 68 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 48 E Current: 48 E 68 D Potential: 68 D

Environmental impact (CO₂)

Current: 71 | Potential: 85
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 71 Current: 71 85 Potential: 85
Field Value
LMK KEY 8770-6026-6420-0075-5226
ADDRESS1 50, Tyddyn Mostyn Estate
ADDRESS2
ADDRESS3
POSTCODE LL59 5DS
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 48
POTENTIAL ENERGY EFFICIENCY 68
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2020-06-25
LOCAL AUTHORITY W06000001
CONSTITUENCY W07000112
COUNTY
LODGEMENT DATE 2020-06-26
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 71
ENVIRONMENT IMPACT POTENTIAL 85
ENERGY CONSUMPTION CURRENT 142
ENERGY CONSUMPTION POTENTIAL 50
CO2 EMISSIONS CURRENT 2.5
CO2 EMISS CURR PER FLOOR AREA 30
CO2 EMISSIONS POTENTIAL 1.1
LIGHTING COST CURRENT 66
LIGHTING COST POTENTIAL 66
HEATING COST CURRENT 796
HEATING COST POTENTIAL 684
HOT WATER COST CURRENT 254
HOT WATER COST POTENTIAL 161
TOTAL FLOOR AREA 84
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, bottled LPG
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL bottled LPG
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 50, Tyddyn Mostyn Estate
LOCAL AUTHORITY LABEL Isle of Anglesey
CONSTITUENCY LABEL Ynys Môn
POSTTOWN MENAI BRIDGE
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2020-06-26 09:56:34
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 9
UPRN 200002647890
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew