Energy Performance Certificate

Te Faruru, The Quarry, SN11 0BX

EPC Report

Energy rating

Current: 61 D | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 61 D Current: 61 D 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 52 | Potential: 77
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 52 Current: 52 77 Potential: 77
Field Value
LMK KEY 8745-6423-9330-2742-5906
ADDRESS1 Te Faruru
ADDRESS2 The Quarry
ADDRESS3
POSTCODE SN11 0BX
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 61
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE House
BUILT FORM Detached
INSPECTION DATE 2015-07-02
LOCAL AUTHORITY E06000054
CONSTITUENCY E14001356
COUNTY
LODGEMENT DATE 2015-07-02
TRANSACTION TYPE None of the above
ENVIRONMENT IMPACT CURRENT 52
ENVIRONMENT IMPACT POTENTIAL 77
ENERGY CONSUMPTION CURRENT 254
ENERGY CONSUMPTION POTENTIAL 115
CO2 EMISSIONS CURRENT 6.8
CO2 EMISS CURR PER FLOOR AREA 45
CO2 EMISSIONS POTENTIAL 3.1
LIGHTING COST CURRENT 145
LIGHTING COST POTENTIAL 79
HEATING COST CURRENT 1228
HEATING COST POTENTIAL 749
HOT WATER COST CURRENT 131
HOT WATER COST POTENTIAL 115
TOTAL FLOOR AREA 153
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and boiler energy manager
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 17
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, TRVs and boiler energy manager
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 17% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.36
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Te Faruru, The Quarry
LOCAL AUTHORITY LABEL Wiltshire
CONSTITUENCY LABEL Melksham and Devizes
POSTTOWN CALNE
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2015-07-02 21:32:18
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 30
LOW ENERGY FIXED LIGHT COUNT 5
UPRN 10070777991
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000009
Address display
Nation ew