Energy Performance Certificate

52, Parc Puw, Velindre, SA44 5UZ

EPC Report

Energy rating

Current: 59 D | Potential: 81 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 D Current: 59 D 81 B Potential: 81 B

Environmental impact (CO₂)

Current: 50 | Potential: 73
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 50 Current: 50 73 Potential: 73
Field Value
LMK KEY 8695-2878-2329-5296-7983
ADDRESS1 52, Parc Puw
ADDRESS2 Velindre
ADDRESS3
POSTCODE SA44 5UZ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 59
POTENTIAL ENERGY EFFICIENCY 81
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2018-11-13
LOCAL AUTHORITY W06000010
CONSTITUENCY W07000087
COUNTY
LODGEMENT DATE 2018-11-13
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 50
ENVIRONMENT IMPACT POTENTIAL 73
ENERGY CONSUMPTION CURRENT 313
ENERGY CONSUMPTION POTENTIAL 155
CO2 EMISSIONS CURRENT 4.8
CO2 EMISS CURR PER FLOOR AREA 67
CO2 EMISSIONS POTENTIAL 2.7
LIGHTING COST CURRENT 70
LIGHTING COST POTENTIAL 70
HEATING COST CURRENT 736
HEATING COST POTENTIAL 585
HOT WATER COST CURRENT 237
HOT WATER COST POTENTIAL 116
TOTAL FLOOR AREA 73
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS No time or thermostatic control of room temperature
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 78
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, limited insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 150 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, dual fuel (mineral and wood)
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION No time or thermostatic control of room temperature
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in 78% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL dual fuel - mineral + wood
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.28
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 52, Parc Puw, Velindre
LOCAL AUTHORITY LABEL Carmarthenshire
CONSTITUENCY LABEL Caerfyrddin
POSTTOWN LLANDYSUL
CONSTRUCTION AGE BAND England and Wales: 1996-2002
LODGEMENT DATETIME 2018-11-13 19:35:59
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100100146980
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew