Energy Performance Certificate

25, Marigold Court, SR4 6DY

EPC Report

Energy rating

Current: 62 D | Potential: 89 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 62 D Current: 62 D 89 B Potential: 89 B

Environmental impact (CO₂)

Current: 59 | Potential: 90
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 59 Current: 59 90 Potential: 90
Field Value
LMK KEY 8693-7429-4499-5084-9926
ADDRESS1 25, Marigold Court
ADDRESS2
ADDRESS3
POSTCODE SR4 6DY
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 62
POTENTIAL ENERGY EFFICIENCY 89
PROPERTY TYPE Bungalow
BUILT FORM Semi-Detached
INSPECTION DATE 2017-11-24
LOCAL AUTHORITY E08000024
CONSTITUENCY E14001531
COUNTY
LODGEMENT DATE 2017-12-06
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 59
ENVIRONMENT IMPACT POTENTIAL 90
ENERGY CONSUMPTION CURRENT 342
ENERGY CONSUMPTION POTENTIAL 80
CO2 EMISSIONS CURRENT 2.8
CO2 EMISS CURR PER FLOOR AREA 60
CO2 EMISSIONS POTENTIAL 0.7
LIGHTING COST CURRENT 57
LIGHTING COST POTENTIAL 34
HEATING COST CURRENT 499
HEATING COST POTENTIAL 343
HOT WATER COST CURRENT 96
HOT WATER COST POTENTIAL 41
TOTAL FLOOR AREA 47
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 25
GLAZED TYPE double glazing installed before 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 2
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 33
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Some double glazing
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 33% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 25, Marigold Court
LOCAL AUTHORITY LABEL Sunderland
CONSTITUENCY LABEL Sunderland Central
POSTTOWN SUNDERLAND
CONSTRUCTION AGE BAND England and Wales: 1976-1982
LODGEMENT DATETIME 2017-12-06 16:35:56
TENURE rented (social)
FIXED LIGHTING OUTLETS COUNT 6
LOW ENERGY FIXED LIGHT COUNT 2
UPRN 45095050
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2017.csv
COUNTRY England
REGION E12000001
Address display
Nation ew