Energy Performance Certificate

16, Feversham Gate, YO31 8HY

EPC Report

Energy rating

Current: 67 D | Potential: 67 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 67 D Current: 67 D 67 D Potential: 67 D

Environmental impact (CO₂)

Current: 63 | Potential: 63
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 63 Current: 63 63 Potential: 63
Field Value
LMK KEY 8608-8216-1029-4996-4313
ADDRESS1 16, Feversham Gate
ADDRESS2
ADDRESS3
POSTCODE YO31 8HY
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 67
POTENTIAL ENERGY EFFICIENCY 67
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2019-07-19
LOCAL AUTHORITY E06000014
CONSTITUENCY E14001604
COUNTY
LODGEMENT DATE 2019-07-22
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 63
ENVIRONMENT IMPACT POTENTIAL 63
ENERGY CONSUMPTION CURRENT 299
ENERGY CONSUMPTION POTENTIAL 299
CO2 EMISSIONS CURRENT 2.8
CO2 EMISS CURR PER FLOOR AREA 51
CO2 EMISSIONS POTENTIAL 2.8
LIGHTING COST CURRENT 47
LIGHTING COST POTENTIAL 47
HEATING COST CURRENT 500
HEATING COST POTENTIAL 500
HOT WATER COST CURRENT 184
HOT WATER COST POTENTIAL 184
TOTAL FLOOR AREA 55
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL 1
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, insulated (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION (another dwelling above)
ROOF ENERGY EFF N/A
ROOF ENV EFF N/A
MAINHEAT DESCRIPTION Boiler and radiators, electric
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR unheated corridor
UNHEATED CORRIDOR LENGTH 7.3
FLOOR HEIGHT 2.4
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 16, Feversham Gate
LOCAL AUTHORITY LABEL York
CONSTITUENCY LABEL York Central
POSTTOWN YORK
CONSTRUCTION AGE BAND England and Wales: 2003-2006
LODGEMENT DATETIME 2019-07-22 23:50:31
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 10
LOW ENERGY FIXED LIGHT COUNT 10
UPRN 10007237263
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000003
Address display
Nation ew