Energy Performance Certificate

11, Langbar View, LS14 5EG

EPC Report

Energy rating

Current: 54 E | Potential: 88 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 54 E Current: 54 E 88 B Potential: 88 B

Environmental impact (CO₂)

Current: 38 | Potential: 70
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 38 Current: 38 70 Potential: 70
Field Value
LMK KEY 8571-7828-0840-3685-4902
ADDRESS1 11, Langbar View
ADDRESS2
ADDRESS3
POSTCODE LS14 5EG
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 54
POTENTIAL ENERGY EFFICIENCY 88
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2019-08-05
LOCAL AUTHORITY E08000035
CONSTITUENCY E14001320
COUNTY
LODGEMENT DATE 2019-08-08
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 38
ENVIRONMENT IMPACT POTENTIAL 70
ENERGY CONSUMPTION CURRENT 473
ENERGY CONSUMPTION POTENTIAL 217
CO2 EMISSIONS CURRENT 7.2
CO2 EMISS CURR PER FLOOR AREA 80
CO2 EMISSIONS POTENTIAL 3.3
LIGHTING COST CURRENT 147
LIGHTING COST POTENTIAL 73
HEATING COST CURRENT 1030
HEATING COST POTENTIAL 671
HOT WATER COST CURRENT 806
HOT WATER COST POTENTIAL 117
TOTAL FLOOR AREA 90
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 0
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION No low energy lighting
LIGHTING ENERGY EFF Very Poor
LIGHTING ENV EFF Very Poor
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY 50
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 11, Langbar View
LOCAL AUTHORITY LABEL Leeds
CONSTITUENCY LABEL Leeds East
POSTTOWN LEEDS
CONSTRUCTION AGE BAND England and Wales: 1967-1975
LODGEMENT DATETIME 2019-08-08 14:15:00
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 8
LOW ENERGY FIXED LIGHT COUNT 0
UPRN 72245724
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000003
Address display
Nation ew