Energy Performance Certificate

3, Clifford Park, Cannington, TA5 2HG

EPC Report

Energy rating

Current: 38 F | Potential: 83 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 38 F Current: 38 F 83 B Potential: 83 B

Environmental impact (CO₂)

Current: 24 | Potential: 61
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 24 Current: 24 61 Potential: 61
Field Value
LMK KEY 8568-7424-5610-7716-5992
ADDRESS1 3, Clifford Park
ADDRESS2 Cannington
ADDRESS3
POSTCODE TA5 2HG
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 38
POTENTIAL ENERGY EFFICIENCY 83
PROPERTY TYPE Bungalow
BUILT FORM Semi-Detached
INSPECTION DATE 2018-04-16
LOCAL AUTHORITY E06000066
CONSTITUENCY E14001126
COUNTY
LODGEMENT DATE 2018-04-16
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 24
ENVIRONMENT IMPACT POTENTIAL 61
ENERGY CONSUMPTION CURRENT 662
ENERGY CONSUMPTION POTENTIAL 250
CO2 EMISSIONS CURRENT 6.9
CO2 EMISS CURR PER FLOOR AREA 112
CO2 EMISSIONS POTENTIAL 2.6
LIGHTING COST CURRENT 79
LIGHTING COST POTENTIAL 50
HEATING COST CURRENT 973
HEATING COST POTENTIAL 478
HOT WATER COST CURRENT 274
HOT WATER COST POTENTIAL 86
TOTAL FLOOR AREA 62
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 80
GLAZED TYPE not defined
GLAZED AREA Much More Than Typical
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 2
LOW ENERGY LIGHTING 43
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Mostly double glazing
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 300 mm loft insulation
ROOF ENERGY EFF Very Good
ROOF ENV EFF Very Good
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 43% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.54
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 3, Clifford Park, Cannington
LOCAL AUTHORITY LABEL Somerset
CONSTITUENCY LABEL Bridgwater
POSTTOWN BRIDGWATER
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2018-04-16 15:46:22
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 3
UPRN 100040884959
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2018.csv
COUNTRY England
REGION E12000009
Address display
Nation ew