Energy Performance Certificate

19-21 Jaunty Way, S12 3DZ

EPC Report

Energy rating

Current: 2 G | Potential: 6 G
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 2 G Current: 2 G 6 G Potential: 6 G

Environmental impact (CO₂)

Current: 17 | Potential: 21
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 17 Current: 17 21 Potential: 21
Field Value
LMK KEY 8552-7221-5600-0672-0226
ADDRESS1 19-21 Jaunty Way
ADDRESS2
ADDRESS3
POSTCODE S12 3DZ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING G
POTENTIAL ENERGY RATING G
CURRENT ENERGY EFFICIENCY 2
POTENTIAL ENERGY EFFICIENCY 6
PROPERTY TYPE Flat
BUILT FORM Mid-Terrace
INSPECTION DATE 2022-09-22
LOCAL AUTHORITY E08000039
CONSTITUENCY E14001470
COUNTY
LODGEMENT DATE 2022-10-07
TRANSACTION TYPE Non-marketed sale
ENVIRONMENT IMPACT CURRENT 17
ENVIRONMENT IMPACT POTENTIAL 21
ENERGY CONSUMPTION CURRENT 781
ENERGY CONSUMPTION POTENTIAL 720
CO2 EMISSIONS CURRENT 10
CO2 EMISS CURR PER FLOOR AREA 132
CO2 EMISSIONS POTENTIAL 9.4
LIGHTING COST CURRENT 68
LIGHTING COST POTENTIAL 69
HEATING COST CURRENT 3082
HEATING COST POTENTIAL 2781
HOT WATER COST CURRENT 660
HOT WATER COST POTENTIAL 660
TOTAL FLOOR AREA 77
ENERGY TARIFF Unknown
MAINS GAS FLAG N
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS None
MULTI GLAZE PROPORTION 40
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 0
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION No system present: electric immersion assumed
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION (other premises below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Partial double glazing
WINDOWS ENERGY EFF Poor
WINDOWS ENV EFF Poor
WALLS DESCRIPTION Cavity wall, as built, no insulation (assumed)
WALLS ENERGY EFF Poor
WALLS ENV EFF Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION No system present: electric heaters assumed
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION None
MAINHEATC ENERGY EFF Very Poor
MAINHEATC ENV EFF Very Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL To be used only when there is no heating/hot-water system or data is from a community network
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.4
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 19-21 Jaunty Way
LOCAL AUTHORITY LABEL Sheffield
CONSTITUENCY LABEL Sheffield South East
POSTTOWN Sheffield
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2022-10-07 13:15:18
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 7
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100051005521
UPRN SOURCE Address Matched
REPORT TYPE 2
Source file certificates-2022.csv
COUNTRY England
REGION E12000003
Address display
Nation ew