Energy Performance Certificate

Flat 2, 9, Cargate Avenue, GU11 3EP

EPC Report

Energy rating

Current: 54 E | Potential: 72 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 54 E Current: 54 E 72 C Potential: 72 C

Environmental impact (CO₂)

Current: 45 | Potential: 69
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 45 Current: 45 69 Potential: 69
Field Value
LMK KEY 8406-4396-9229-4206-2313
ADDRESS1 Flat 2
ADDRESS2 9, Cargate Avenue
ADDRESS3
POSTCODE GU11 3EP
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 54
POTENTIAL ENERGY EFFICIENCY 72
PROPERTY TYPE Flat
BUILT FORM Semi-Detached
INSPECTION DATE 2019-07-01
LOCAL AUTHORITY E07000092
CONSTITUENCY E14001063
COUNTY
LODGEMENT DATE 2019-08-19
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 45
ENVIRONMENT IMPACT POTENTIAL 69
ENERGY CONSUMPTION CURRENT 327
ENERGY CONSUMPTION POTENTIAL 177
CO2 EMISSIONS CURRENT 6.2
CO2 EMISS CURR PER FLOOR AREA 58
CO2 EMISSIONS POTENTIAL 3.3
LIGHTING COST CURRENT 81
LIGHTING COST POTENTIAL 81
HEATING COST CURRENT 1060
HEATING COST POTENTIAL 537
HOT WATER COST CURRENT 129
HOT WATER COST POTENTIAL 130
TOTAL FLOOR AREA 108
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL 3
FLAT TOP STOREY Y
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Room thermostat only
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION (another dwelling below)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, no insulation (assumed)
ROOF ENERGY EFF Very Poor
ROOF ENV EFF Very Poor
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Room thermostat only
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR no corridor
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.37
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Flat 2, 9, Cargate Avenue
LOCAL AUTHORITY LABEL Rushmoor
CONSTITUENCY LABEL Aldershot
POSTTOWN ALDERSHOT
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2019-08-19 10:23:57
TENURE rented (private)
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 11
UPRN 100062323416
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000008
Address display
Nation ew