Energy Performance Certificate

3, Ash Place, Berry Close, CB6 3JW

EPC Report

Energy rating

Current: 64 D | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 64 D Current: 64 D 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 48 | Potential: 68
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 48 Current: 48 68 Potential: 68
Field Value
LMK KEY 8401-6424-5550-9335-6902
ADDRESS1 3, Ash Place
ADDRESS2 Berry Close
ADDRESS3
POSTCODE CB6 3JW
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 64
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2019-04-05
LOCAL AUTHORITY E07000009
CONSTITUENCY E14001224
COUNTY
LODGEMENT DATE 2019-04-05
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 48
ENVIRONMENT IMPACT POTENTIAL 68
ENERGY CONSUMPTION CURRENT 441
ENERGY CONSUMPTION POTENTIAL 246
CO2 EMISSIONS CURRENT 3.5
CO2 EMISS CURR PER FLOOR AREA 75
CO2 EMISSIONS POTENTIAL 1.9
LIGHTING COST CURRENT 50
LIGHTING COST POTENTIAL 50
HEATING COST CURRENT 511
HEATING COST POTENTIAL 470
HOT WATER COST CURRENT 148
HOT WATER COST POTENTIAL 83
TOTAL FLOOR AREA 47
ENERGY TARIFF dual
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Manual charge control
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 3
NUMBER HEATED ROOMS 3
LOW ENERGY LIGHTING 78
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION Electric immersion, off-peak
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, as built, insulated (assumed)
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Portable electric heaters (assumed)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Electric storage heaters
MAINHEAT ENERGY EFF Poor
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Manual charge control
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 78% of fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.29
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 3, Ash Place, Berry Close
LOCAL AUTHORITY LABEL East Cambridgeshire
CONSTITUENCY LABEL Ely and East Cambridgeshire
POSTTOWN ELY
CONSTRUCTION AGE BAND England and Wales: 1983-1990
LODGEMENT DATETIME 2019-04-05 17:03:44
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 100091189930
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000006
Address display
Nation ew