Energy Performance Certificate

Caramba, Marham Road, Fincham, PE33 9ES

EPC Report

Energy rating

Current: 45 E | Potential: 82 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 45 E Current: 45 E 82 B Potential: 82 B

Environmental impact (CO₂)

Current: 38 | Potential: 75
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 38 Current: 38 75 Potential: 75
Field Value
LMK KEY 8375-7722-3600-2232-1906
ADDRESS1 Caramba
ADDRESS2 Marham Road
ADDRESS3 Fincham
POSTCODE PE33 9ES
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 45
POTENTIAL ENERGY EFFICIENCY 82
PROPERTY TYPE Bungalow
BUILT FORM Detached
INSPECTION DATE 2015-02-02
LOCAL AUTHORITY E07000146
CONSTITUENCY E14001497
COUNTY
LODGEMENT DATE 2015-02-02
TRANSACTION TYPE Rental
ENVIRONMENT IMPACT CURRENT 38
ENVIRONMENT IMPACT POTENTIAL 75
ENERGY CONSUMPTION CURRENT 321
ENERGY CONSUMPTION POTENTIAL 90
CO2 EMISSIONS CURRENT 5.5
CO2 EMISS CURR PER FLOOR AREA 83
CO2 EMISSIONS POTENTIAL 1.9
LIGHTING COST CURRENT 44
LIGHTING COST POTENTIAL 44
HEATING COST CURRENT 775
HEATING COST POTENTIAL 456
HOT WATER COST CURRENT 272
HOT WATER COST POTENTIAL 90
TOTAL FLOOR AREA 67
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 1
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 100 mm loft insulation
ROOF ENERGY EFF Average
ROOF ENV EFF Average
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Poor
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.41
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS Caramba, Marham Road, Fincham
LOCAL AUTHORITY LABEL King's Lynn and West Norfolk
CONSTITUENCY LABEL South West Norfolk
POSTTOWN KING'S LYNN
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2015-02-02 16:03:16
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 12
LOW ENERGY FIXED LIGHT COUNT 12
UPRN 100091355989
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000006
Address display
Nation ew