Energy Performance Certificate

59, Meanley Road, E12 6AP

EPC Report

Energy rating

Current: 61 D | Potential: 79 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 61 D Current: 61 D 79 C Potential: 79 C

Environmental impact (CO₂)

Current: 53 | Potential: 74
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 53 Current: 53 74 Potential: 74
Field Value
LMK KEY 8335-7828-3450-9097-7906
ADDRESS1 59, Meanley Road
ADDRESS2
ADDRESS3
POSTCODE E12 6AP
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING D
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 61
POTENTIAL ENERGY EFFICIENCY 79
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2015-08-03
LOCAL AUTHORITY E09000025
CONSTITUENCY E14001213
COUNTY
LODGEMENT DATE 2015-08-07
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 53
ENVIRONMENT IMPACT POTENTIAL 74
ENERGY CONSUMPTION CURRENT 236
ENERGY CONSUMPTION POTENTIAL 112
CO2 EMISSIONS CURRENT 4.9
CO2 EMISS CURR PER FLOOR AREA 42
CO2 EMISSIONS POTENTIAL 2.3
LIGHTING COST CURRENT 110
LIGHTING COST POTENTIAL 68
HEATING COST CURRENT 898
HEATING COST POTENTIAL 651
HOT WATER COST CURRENT 95
HOT WATER COST POTENTIAL 61
TOTAL FLOOR AREA 117
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer and room thermostat
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 6
LOW ENERGY LIGHTING 38
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Suspended, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Solid brick, as built, no insulation (assumed)
WALLS ENERGY EFF Very Poor
WALLS ENV EFF Very Poor
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer and room thermostat
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in 38% of fixed outlets
LIGHTING ENERGY EFF Average
LIGHTING ENV EFF Average
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.9
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 59, Meanley Road
LOCAL AUTHORITY LABEL Newham
CONSTITUENCY LABEL East Ham
POSTTOWN LONDON
CONSTRUCTION AGE BAND England and Wales: 1900-1929
LODGEMENT DATETIME 2015-08-07 07:52:10
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 13
LOW ENERGY FIXED LIGHT COUNT 5
UPRN 46049853
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2015.csv
COUNTRY England
REGION E12000007
Address display
Nation ew