Energy Performance Certificate

5, Ffordd Pennant, Mostyn, CH8 9NU

EPC Report

Energy rating

Current: 51 E | Potential: 75 C
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 51 E Current: 51 E 75 C Potential: 75 C

Environmental impact (CO₂)

Current: 45 | Potential: 69
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 45 Current: 45 69 Potential: 69
Field Value
LMK KEY 8311-6826-9420-4263-3992
ADDRESS1 5, Ffordd Pennant
ADDRESS2 Mostyn
ADDRESS3
POSTCODE CH8 9NU
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING E
POTENTIAL ENERGY RATING C
CURRENT ENERGY EFFICIENCY 51
POTENTIAL ENERGY EFFICIENCY 75
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2019-06-17
LOCAL AUTHORITY W06000005
CONSTITUENCY W07000094
COUNTY
LODGEMENT DATE 2019-06-17
TRANSACTION TYPE None of the above
ENVIRONMENT IMPACT CURRENT 45
ENVIRONMENT IMPACT POTENTIAL 69
ENERGY CONSUMPTION CURRENT 257
ENERGY CONSUMPTION POTENTIAL 122
CO2 EMISSIONS CURRENT 6.0
CO2 EMISS CURR PER FLOOR AREA 64
CO2 EMISSIONS POTENTIAL 3.2
LIGHTING COST CURRENT 66
LIGHTING COST POTENTIAL 66
HEATING COST CURRENT 748
HEATING COST POTENTIAL 501
HOT WATER COST CURRENT 173
HOT WATER COST POTENTIAL 141
TOTAL FLOOR AREA 94
ENERGY TARIFF Single
MAINS GAS FLAG N
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, TRVs and bypass
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 5
NUMBER HEATED ROOMS 5
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Average
HOT WATER ENV EFF Average
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, electric
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 200 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, oil
MAINHEAT ENERGY EFF Average
MAINHEAT ENV EFF Average
MAINHEATCONT DESCRIPTION Programmer, TRVs and bypass
MAINHEATC ENERGY EFF Average
MAINHEATC ENV EFF Average
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL oil (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.5
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 5, Ffordd Pennant, Mostyn
LOCAL AUTHORITY LABEL Flintshire
CONSTITUENCY LABEL Clwyd East
POSTTOWN HOLYWELL
CONSTRUCTION AGE BAND England and Wales: 1930-1949
LODGEMENT DATETIME 2019-06-17 18:49:36
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 12
LOW ENERGY FIXED LIGHT COUNT 12
UPRN 100100240417
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY Wales
REGION W99999999
Address display
Nation ew