Energy Performance Certificate

53, Redington Road, L19 4UB

EPC Report

Energy rating

Current: 22 F | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 22 F Current: 22 F 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 32 | Potential: 81
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 32 Current: 32 81 Potential: 81
Field Value
LMK KEY 8280-7322-6300-3973-9226
ADDRESS1 53, Redington Road
ADDRESS2
ADDRESS3
POSTCODE L19 4UB
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 22
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM End-Terrace
INSPECTION DATE 2020-02-27
LOCAL AUTHORITY E08000012
CONSTITUENCY E14001337
COUNTY
LODGEMENT DATE 2020-02-27
TRANSACTION TYPE ECO assessment
ENVIRONMENT IMPACT CURRENT 32
ENVIRONMENT IMPACT POTENTIAL 81
ENERGY CONSUMPTION CURRENT 483
ENERGY CONSUMPTION POTENTIAL 105
CO2 EMISSIONS CURRENT 7.8
CO2 EMISS CURR PER FLOOR AREA 83
CO2 EMISSIONS POTENTIAL 1.8
LIGHTING COST CURRENT 98
LIGHTING COST POTENTIAL 98
HEATING COST CURRENT 1864
HEATING COST POTENTIAL 473
HOT WATER COST CURRENT 530
HOT WATER COST POTENTIAL 74
TOTAL FLOOR AREA 95
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS No thermostatic control of room temperature
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing, unknown install date
GLAZED AREA Normal
EXTENSION COUNT 1
NUMBER HABITABLE ROOMS 6
NUMBER HEATED ROOMS 1
LOW ENERGY LIGHTING 64
NUMBER OPEN FIREPLACES 1
HOTWATER DESCRIPTION Electric immersion, standard tariff
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, mains gas
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 270 mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Portable electric heaters assumed for most rooms
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Poor
MAINHEATCONT DESCRIPTION No thermostatic control of room temperature
MAINHEATC ENERGY EFF Poor
MAINHEATC ENV EFF Poor
LIGHTING DESCRIPTION Low energy lighting in 64% of fixed outlets
LIGHTING ENERGY EFF Good
LIGHTING ENV EFF Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.41
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 53, Redington Road
LOCAL AUTHORITY LABEL Liverpool
CONSTITUENCY LABEL Liverpool Garston
POSTTOWN LIVERPOOL
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2020-02-27 17:59:04
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 11
LOW ENERGY FIXED LIGHT COUNT 7
UPRN 38125305
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2020.csv
COUNTRY England
REGION E12000002
Address display
Nation ew