Energy Performance Certificate

10, Ellington Road, Barnham, IP24 2NN

EPC Report

Energy rating

Current: 36 F | Potential: 63 D
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 36 F Current: 36 F 63 D Potential: 63 D

Environmental impact (CO₂)

Current: 46 | Potential: 69
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 46 Current: 46 69 Potential: 69
Field Value
LMK KEY 8207-4189-9929-9206-8623
ADDRESS1 10, Ellington Road
ADDRESS2 Barnham
ADDRESS3
POSTCODE IP24 2NN
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING F
POTENTIAL ENERGY RATING D
CURRENT ENERGY EFFICIENCY 36
POTENTIAL ENERGY EFFICIENCY 63
PROPERTY TYPE House
BUILT FORM Mid-Terrace
INSPECTION DATE 2012-06-08
LOCAL AUTHORITY E07000245
CONSTITUENCY E14001146
COUNTY
LODGEMENT DATE 2012-06-09
TRANSACTION TYPE marketed sale
ENVIRONMENT IMPACT CURRENT 46
ENVIRONMENT IMPACT POTENTIAL 69
ENERGY CONSUMPTION CURRENT 373
ENERGY CONSUMPTION POTENTIAL 200
CO2 EMISSIONS CURRENT
CO2 EMISS CURR PER FLOOR AREA
CO2 EMISSIONS POTENTIAL
LIGHTING COST CURRENT 81
LIGHTING COST POTENTIAL 43
HEATING COST CURRENT 850
HEATING COST POTENTIAL 715
HOT WATER COST CURRENT 336
HOT WATER COST POTENTIAL 204
TOTAL FLOOR AREA 70
ENERGY TARIFF dual
MAINS GAS FLAG
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE
GLAZED AREA
EXTENSION COUNT 0
NUMBER HABITABLE ROOMS 4
NUMBER HEATED ROOMS 4
LOW ENERGY LIGHTING 11
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Very Poor
HOT WATER ENV EFF Very Poor
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Average
WINDOWS ENV EFF Average
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Good
WALLS ENV EFF Good
SECONDHEAT DESCRIPTION None
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, 250mm loft insulation
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, electric
MAINHEAT ENERGY EFF Very Poor
MAINHEAT ENV EFF Very Poor
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in 11% of fixed outlets
LIGHTING ENERGY EFF Poor
LIGHTING ENV EFF Poor
MAIN FUEL electricity (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.24
PHOTO SUPPLY
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 10, Ellington Road, Barnham
LOCAL AUTHORITY LABEL West Suffolk
CONSTITUENCY LABEL Bury St Edmunds and Stowmarket
POSTTOWN THETFORD
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2012-06-09 22:37:12
TENURE
FIXED LIGHTING OUTLETS COUNT 9
LOW ENERGY FIXED LIGHT COUNT 1
UPRN 100091119771
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2012.csv
COUNTRY England
REGION E12000006
Address display
Nation ew