Energy Performance Certificate

47, Back Lane, Chapel Brampton, NN6 8AJ

EPC Report

Energy rating

Current: 75 C | Potential: 84 B
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 75 C Current: 75 C 84 B Potential: 84 B

Environmental impact (CO₂)

Current: 72 | Potential: 80
Current Potential A 92–100 B 81–91 C 69–80 D 55–68 E 39–54 F 21–38 G 1–20 72 Current: 72 80 Potential: 80
Field Value
LMK KEY 8151-7922-6710-1252-6926
ADDRESS1 47, Back Lane
ADDRESS2 Chapel Brampton
ADDRESS3
POSTCODE NN6 8AJ
BUILDING REFERENCE NUMBER
CURRENT ENERGY RATING C
POTENTIAL ENERGY RATING B
CURRENT ENERGY EFFICIENCY 75
POTENTIAL ENERGY EFFICIENCY 84
PROPERTY TYPE House
BUILT FORM Semi-Detached
INSPECTION DATE 2019-02-22
LOCAL AUTHORITY E06000062
CONSTITUENCY E14001192
COUNTY
LODGEMENT DATE 2019-02-22
TRANSACTION TYPE Marketed sale
ENVIRONMENT IMPACT CURRENT 72
ENVIRONMENT IMPACT POTENTIAL 80
ENERGY CONSUMPTION CURRENT 155
ENERGY CONSUMPTION POTENTIAL 101
CO2 EMISSIONS CURRENT 3.5
CO2 EMISS CURR PER FLOOR AREA 28
CO2 EMISSIONS POTENTIAL 2.3
LIGHTING COST CURRENT 80
LIGHTING COST POTENTIAL 80
HEATING COST CURRENT 593
HEATING COST POTENTIAL 593
HOT WATER COST CURRENT 105
HOT WATER COST POTENTIAL 72
TOTAL FLOOR AREA 126
ENERGY TARIFF Single
MAINS GAS FLAG Y
FLOOR LEVEL
FLAT TOP STOREY N
FLAT STOREY COUNT 2
MAIN HEATING CONTROLS Programmer, room thermostat and TRVs
MULTI GLAZE PROPORTION 100
GLAZED TYPE double glazing installed during or after 2002
GLAZED AREA Normal
EXTENSION COUNT 2
NUMBER HABITABLE ROOMS 7
NUMBER HEATED ROOMS 7
LOW ENERGY LIGHTING 100
NUMBER OPEN FIREPLACES 0
HOTWATER DESCRIPTION From main system
HOT WATER ENERGY EFF Good
HOT WATER ENV EFF Good
FLOOR DESCRIPTION Solid, no insulation (assumed)
FLOOR ENERGY EFF N/A
FLOOR ENV EFF N/A
WINDOWS DESCRIPTION Fully double glazed
WINDOWS ENERGY EFF Good
WINDOWS ENV EFF Good
WALLS DESCRIPTION Cavity wall, filled cavity
WALLS ENERGY EFF Average
WALLS ENV EFF Average
SECONDHEAT DESCRIPTION Room heaters, dual fuel (mineral and wood)
SHEATING ENERGY EFF N/A
SHEATING ENV EFF N/A
ROOF DESCRIPTION Pitched, insulated at rafters
ROOF ENERGY EFF Good
ROOF ENV EFF Good
MAINHEAT DESCRIPTION Boiler and radiators, mains gas
MAINHEAT ENERGY EFF Good
MAINHEAT ENV EFF Good
MAINHEATCONT DESCRIPTION Programmer, room thermostat and TRVs
MAINHEATC ENERGY EFF Good
MAINHEATC ENV EFF Good
LIGHTING DESCRIPTION Low energy lighting in all fixed outlets
LIGHTING ENERGY EFF Very Good
LIGHTING ENV EFF Very Good
MAIN FUEL mains gas (not community)
WIND TURBINE COUNT 0
HEAT LOSS CORRIDOR
UNHEATED CORRIDOR LENGTH
FLOOR HEIGHT 2.29
PHOTO SUPPLY 0
SOLAR WATER HEATING FLAG N
MECHANICAL VENTILATION natural
ADDRESS 47, Back Lane, Chapel Brampton
LOCAL AUTHORITY LABEL West Northamptonshire
CONSTITUENCY LABEL Daventry
POSTTOWN NORTHAMPTON
CONSTRUCTION AGE BAND England and Wales: 1950-1966
LODGEMENT DATETIME 2019-02-22 17:27:31
TENURE owner-occupied
FIXED LIGHTING OUTLETS COUNT 14
LOW ENERGY FIXED LIGHT COUNT 14
UPRN 28022792
UPRN SOURCE Energy Assessor
REPORT TYPE 2
Source file certificates-2019.csv
COUNTRY England
REGION E12000004
Address display
Nation ew